Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
109307
906 North State Street Big Rapids, MI 49307
4.83
54-17-11-120-001
43.7087794 / -85.4841616
2


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
County of MecostaBF00E01074MIAssessment2012
Mecosta CountyBF00E41401MIAssessment2007


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,000.0009/29/200901/26/2010Mecosta CountyYFY10
Phase I Environmental Assessment$5,000.0012/05/201201/31/2013County of MecostaN
Phase II Environmental Assessment$44,975.0012/17/201201/31/2013County of MecostaN
Supplemental Assessment$16,476.0002/18/201308/16/2013County of MecostaN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $69,451.00
Leveraged Funding:
Total Funding: $69,451.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Asbestos
Cadmium (Cd)
Chromium (Cr)
Lead
Mercury
Other Metals
PAHS
PCBS
Petroleum Products
Selenium (Se)
SVOCs
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Building Materials
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 4.83
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
Yes
Cover Technologies (e.g., Capping)
direct contact exposure barrier
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
06/01/2016$500,000.00County of Mecosta
06/01/2016$2,500,000.00County of Mecosta


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: Between 1884 and 1899 it appeared a lumber company operated on the Property. As of 1908, the Property use transitioned to manufacturing. Various machining companies occupied the Property from 1908 to 2009. The manufacturing operations reportedly included l fabrication, welding, grinding, sandblasting, baking, relaxing, cutting, assemblage, testing, packaging, shipping, and chemical use and storage e.g., oil, gasoline, fuel oil. At the time of the 2009 reconnaissance, Hanchett Manufacturing occupied the Property and produced saw blades and various types of machinery. During the 2012 reconnaissance, the Property consisted of 4.8 acres of land developed with a manufacturing building, storage shed, and garage. Remaining portions of the Property were developed with gravel, brush, landscaped, and grass-covered areas. The Property was situated in an area zoned for industrial, residential, and commercial uses, and was surrounded by miscellaneous manufacturing businesses, retail establishments and residences.
Industry (4.83)
Hazardous


Top of Page