Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
111361
423 U.S. Route 1/38 Old County Road Pembroke, ME 04666
.5
44.950729 / -67.1681956
2
Ferrari, Joe
Ferrari.Joe@epa.gov
6179181105


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Washington County Council of GovernmentsBF96114701MEAssessment2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$6,225.0002/24/201004/26/2010Washington County Council of GovernmentsYFY11
Phase II Environmental Assessment$70,004.0009/28/201001/06/2011Washington County Council of GovernmentsN


Is Cleanup Necessary? No
EPA Assessment Funding: $76,229.00
Leveraged Funding:
Total Funding: $76,229.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
Other Metals
PAHS
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .5
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No pending regulatory obligation; an environmental covenant should be recorded on the Site property deed which notifies future owners or operators of the presence of petroleum-impacted soils and soil gas, at a
minimum. This has not been completed to date (9/10/15)
No
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
03/01/2014$250,000.00Washington County Council of Governments12/31/2014


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site contained an auto body shop, a paint shop, and a gas station from the 1970s to 2006. There was a Maine Department of Environmental Protection DEP reportable release of gasoline at the Site in 1993. The potential for additional historical releases of OHM, such as waste oil, lubricants, and hydraulic oil, at the Site qualified as a REC. Two gasoline USTs were removed from the Site. Relatively low concentrations of petroleum hydrocarbons remain in subsurface.

Former Use: According to historical topographic maps and aerial photographs of the area obtained from Environmental Data Resources Inc. EDR, U.S. Route 1 used to follow Old County Road until it was rerouted sometime between 1949 and 1956, creating the triangle. According to the Pembroke assessor�s card for the Site, the building on the Site was constructed in 1980. Additional research indicates the Site was operated as a grocery store, gas station, and auto body shop from the 1970s until 2006. According to a representative of the Pembroke Historical Society, a diner operated at the Site at least as early as the 1960s until the Antone�s opened their business at the Site.
Commercial (.5)
Petroleum


Top of Page