Profile Information

Private
116045
309-310 Meredith and 302 Thompson Saginaw, MI 48601
4.98
08-0529-00000, 08-0527-00000, 07-0386-00000
43.4194699 / -83.9508068
999
Winland, Cynthia
cresentdr@chartermi.net
(989) 839-2031


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Saginaw County Brownfield Redevelopment AuthorityBF00E96701MIAssessment2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,100.0004/29/201006/07/2010Saginaw County Brownfield Redevelopment AuthorityYFY12
Phase II Environmental Assessment$18,036.0006/07/201007/09/2010Saginaw County Brownfield Redevelopment AuthorityN


Is Cleanup Necessary? No
EPA Assessment Funding: $20,136.00
Leveraged Funding:
Total Funding: $20,136.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


PAHS
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 4.98
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls Information Devices
The future redevelopment of the property with St Marys meidcal facility parking will offset the property used for teh Central Michigan University medical facility and St. Mary's hospital. The redevelopment will include the use of instituional controls to reliably prevent exposure risks and exacerbation of contaminants.
No
Yes
Cover Technologies (e.g., Capping)
Prior to the completion of the redevelopment all greenspaces will be capped with a minimum of 1-foot of clean imported fill material to reliably segregate contaminants from future users. The redevelopment is scheduled to initiate in the spring of 2013.
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

St. Mary's Medical purchased the property for redevelopment as a parking lot. The parking lot will compensate for parking lost during expansion of the medical facility, which will occur within the current parking lot.

Former Use: 310 Meredith In the early 1900s this parcel was occupied by Booth & Boyd Lumber Co�s and C.S. & M. Lumber Yard, several structures and five railroad spurs. From the 1930s into the 1950s, the parcel contained five railroad spurs, coal structure, office, warehouse, a filling station, auto service business, and three gasoline tanks. In the 1960s, five railroad spurs, a filling station, auto service business, and two gasoline tanks were located at this parcel. Sometime before the 1980s all structures on the parcel were demolished. A structure was located on the property from the late 1990s until 2006 when it was removed from the parcel. At the completion of this Phase I ESA this parcel was occupied by two railroad spurs, a gravel parking area, and loading platform. 309 Meredith This parcel of land contained several dwellings, a portion of a fertilizer shed, several outbuildings, and two railroad spurs from 1901 until sometime before the 1930s. In the mid 1930s, this parcel contained a junk yard, a rag and paper warehouse, two other structures, and two railroad spurs. By the 1950s this parcel was undeveloped with the exception of the railroad spurs. Sometime before the 1980s the railroad spurs were removed from the parcel. In the 1990s a single structure was located at this property until it was removed in the early 2000s. This parcel has been undeveloped since the early 2000s through the completion of this Phase I ESA. 302 Thompson This parcel was occupied by a Freight Warehouse, two tool houses, and several railroad spurs in the 1950s. By the 1960s only the Freight Warehouse and several railroad spurs remained on the parcel. The Freight Warehouse and the railroad spurs remained at the subject property until the early 1980s when the structure was demolished and the spurs removed. Parcel B has been undeveloped from the early 1980s through the completion of this Phase I ESA.
Commercial (2) Industry (2.9)
Hazardous & Petroleum


Top of Page