119782
1111 Grand Avenue Kansas City, MO 64106
.14
29-220-50-03-00-0-00-000
39.100636 / -94.58050100000003
5
Klein, Susan
Klein.Susan@epa.gov
913-551-7786


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Kansas City, City ofBF98787101MOAssessment2007


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$1,311.0010/01/201010/28/2010Kansas City, City ofYFY14
Supplemental Assessment$10,483.0001/06/201103/17/2011Kansas City, City ofN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $11,794.00
Leveraged Funding:
Total Funding: $11,794.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
Cleaned Up
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
03/18/201101/22/2013Kansas City, City of


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .14
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding: $353,584.00
Cost Share Funding:
Total Funding: $353,584.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
VCP Certificate of Completion requires an Operations and Maintenance Plan for Asbestos as part of the Activity Use Limitation (AUL).
https://www.dnr.mo.gov/molts/gov/mo/dnr/lts/map/summary.action?id=2206
Yes
01/22/2013
Yes
Immobilization Process (e.g., Encapsulation, In-Situ Solidification) Other SSD system is in place
Asbestos Operations and Maintenance Plan to address remaining on-site contaminants (encapsulated lead-based paint)
https://www.dnr.mo.gov/molts/gov/mo/dnr/lts/map/summary.action?id=2206
Yes
01/22/2013


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
03/18/2011$2,182,472.00Kansas City, City of06/01/2012
03/18/2011$9,107,528.00Kansas City, City of06/01/2012


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Recognized Environmental Conditions identified during the Phase I Environmental Site Assessment included the proximity of the building to a dry cleaner, along with the presence of lead-based paint and asbestos throughout the building in painted surfaces and in tile, thermal insulation, and roofing material. The site owner completed the project independently through the Missouri Brownfield Voluntary Cleanup Program. The site has been opened as the Ambassodor Hotel Kansas City in June 2012. The redevelopment removed a blighted and vacant property form the heart of downtown Kansas City, Missouri. The six-story neoclassical structure has been transformed into a 43-room luxury boutique hotel with an investment of 11,290,000. The site was enrolled in the Missouri Department of Natural Resources Voluntary Cleanup Program in 2011. The VCP issued a Certificate of Completion with Activity Use Limitations (AULs) January, 2013. The AULs include a Operations & Maintenance Plan for asbestos-containing materials. Both the on-site cleanup activities were completed prior to June 2012, although the exact date is not available.

Former Use: This 0.14 acre site consists of a 7-story office building, including basement, with a total of 42,000 square feet. The current building was constructed in 1930, but the site was developed prior to 1896. The site was utilized by the Gate City National Bank and for retail and offices from 1920 to 1970. Since that time the building has been used for office space and nightclubs.
Hazardous
Enrolled: 03/18/2011
01/22/2013