Overland Industrial Park
Government
131061
1000 Jeep Parkway Toledo, OH 43610
111
41.6872729 / -83.5614193
9
Stimple, Bradley
stimple.brad@epa.gov
440-250-1717


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Toledo, City of 2B00E97001OHBCRLF2009


Top of Page


Assessment Activities at this Property

There are no current assessment activities.


Is Cleanup Necessary?
EPA Assessment Funding:
Leveraged Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Lead
Petroleum Products
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Ground Water
Soil
NOT Cleaned up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
04/07/2011$340,000.0003/12/2012Toledo, City of No
04/07/201103/12/2012Toledo, City of No
04/07/201103/12/2012Toledo, City of No


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Eight remedial activities were conducted under OAC 3745-300-11 in response to the findings of the Phase II activities for this Property. Excavation of soils in the 0-2 foot point of compliance and beneficial reuse as fill in subsurface locations on the Property occurred in two areas, excavation of soil and treatment with potassium permanganate, with soils returned to excavation after treatment occurred in two other areas, excavation and off-property disposal occurred in yet another two areas, excavation and off-property disposal with an engineering control occurred in one area, and finally, free product recovery with off property disposal and in-situ bioremediation took place in the eighth area.
Address of Data Source:
Total ACRES Cleaned Up: 111
Number of Cleanup Jobs Leveraged: 150
EPA Cleanup Funding: $340,000.00
Leveraged Funding: $5,800,000.00
Cost Share Funding:
Total Funding: $6,140,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate demolition or cleanup activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls
The EC limits the Property to commercial or industrial land uses, as those terms are defined in OAC 3745-300-08(C)(2) (effective March 1, 2009), and (2) prohibit the extraction or use of ground water underlying the Property for any potable purpose.
Yes
05/09/2016
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
04/20/2012$78,000,000.00Toledo, City of 08/17/2017
04/20/2012$75,000,000.00Toledo, City of 08/17/2017
04/20/2012$2,430,000.00Toledo, City of 08/17/2017
04/20/2012$8,000,000.00Toledo, City of 08/17/2017
04/20/2012$2,800,000.00Toledo, City of 08/17/2017
04/20/2012$718,124.00Toledo, City of 08/17/2017


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate redevelopment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Additional Property Attributes

May 9, 2016 - The Toledo-Lucas County Port Authority and NAI Harmon Group announced today that Dana Holding Corporation will open a new high-tech axle manufacturing facility at Overland Industrial Park, making Dana the first tenant on the recently redeveloped site. The addition of this new facility will employ over 300 associates by 2020. Dana plans to lease the existing 100,000 square foot facility on the property, and the Port Authority and NAI Harmon Group will work to expand the building to nearly 300,000 square feet. Dana will be investing approximately $70 million in machinery and equipment in the facility over the next few years. The Port Authority and NAI Harmon Group began construction on the 100,000 square foot class A pre-cast, concrete industrial building in June 2014 and held a ribbon cutting ceremony for the facility last October. The facility was designed to suit warehouse/distribution or light manufacturing/assembly operations. Without the current facility already constructed on the site, Dana would not have selected Overland Industrial Park for its new high-tech axle manufacturing facility.

August 24, 2016 The Toledo-Lucas County Port Authority and NAI Harmon Group announced today that Detroit Manufacturing Systems (DMS) will construct a 102,000 sq. ft. facility at Overland Industrial Park ($78 million investment), making DMS the second tenant on the recently redeveloped site. DMS manufactures interior parts for the next generation Jeep Wrangler and will employ 140 new workers.

Former Use: Site of the former Toledo Jeep Assembly plant. This property was the location of the oldest, longest operating manufacturing facility before its closure in 2004. The structures have been demolished. The former owner, Chrysler Corp., entered bankruptcy and the property was transfered to the Toledo-Lucas County Port Authority.
Industry (111)
Hazardous
Enrolled: 04/01/2011
05/09/2016