Profile Information

Private
144181
20 Canal Street Franklin, NH 03235
4.14
117-365-00 & 117-153-00
43.445717 / -71.645306
2
Peterson, Alan
Peterson.Alan@epa.gov
617-918-1022


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Lakes Region Planning CommissionBF96111801NHAssessment2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,000.0005/01/201209/12/2012Lakes Region Planning CommissionYFY13
Phase II Environmental Assessment$29,081.0009/13/201203/25/2013Lakes Region Planning CommissionN
Supplemental Assessment07/15/201412/11/2014Lakes Region Planning CommissionN
Supplemental Assessment07/15/2015Lakes Region Planning CommissionN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $32,081.00
Leveraged Funding: $17,872.00
Total Funding: $49,953.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Asbestos
Lead
PAHS
Petroleum Products
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Soil
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
03/22/202112/06/2023Lakes Region Planning CommissionNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 4.14
Number of Cleanup Jobs Leveraged: 4
EPA Cleanup Funding:
Leveraged Funding: $485,000.00
Cost Share Funding:
Total Funding: $485,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
No
U
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
05/11/2022$50,000,000.00Lakes Region Planning Commission08/31/2024
05/11/2022$2,200,000.00Lakes Region Planning Commission08/31/2024


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate redevelopment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Additional Property Attributes

Two (2) large mill buildings are located on the site that was constructed in the early 1900s. The current owner of the property is interested in redeveloping an underutilized parking lot on the parcel 117-153, but a ?Red Tagged? 20,000-gallon UST occupies part of this area. According to available information, the Site was reportedly first developed sometime before 1884. The site appears to have only been used as a parking lot, for bulk oil storage of fuel oil to run the heating system(s) in the adjacent building(s). The former use of the very small brick storage building remains unknown, but this area of Franklin has had a long history of industrial use beginning in the 1800?s extending to the 1970?s. In fact, the Site was likely used as mill yard that served the previous mill operation known to have occupied the building surrounding (including the building extension and very small brick building). Known past uses of the surrounding buildings and properties in the general area of the Site include: Metal fabrication and machining, paper making, electric generation, wool milling (including dying), and carpentry. On November 7, 2011, the NHDES requested that this UST system be removed and permanently closed due to corrosion protection testing non-compliance. Due to the fact that the tank was in service since at least 1984, there is the potential for spills or releases to have occurred and impacted soil and/or groundwater at the site.

Former Use: The Franklin Business Center site is located at 20 Canal Street in Franklin and is comprised of two (2) parcels of land (Parcel ID?s 117-365-00 & 117-153-00) totaling 4.14-acres. The current owner of the site is Mass Investment Group, LLC c/o Edward Bussiere, Jr. The Mass Investment Group, LLC acquired the property from Joseph Romano Realty, Inc. in December of 2006.
Industry (4.14)
Petroleum
12/06/2023