Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
156962
320 Main Street Fort Fairfield, ME 04742
.33
46.771761 / -67.8316691
2
Ferrari, Joe
Ferrari.Joe@epa.gov
6179181105


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Northern Maine Development CommissionBF96166201MEAssessment2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$22,159.0011/16/201202/26/2013Northern Maine Development CommissionYFY14


Is Cleanup Necessary? Yes
EPA Assessment Funding: $22,159.00
Leveraged Funding:
Total Funding: $22,159.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Petroleum Products
Petroleum Products
Cleaned Up
Cleaned Up
Petroleum Products
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
04/25/201304/30/2013Northern Maine Development Commission


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .33
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding: $3,499.00
Cost Share Funding:
Total Funding: $3,499.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls
Groundwater use and soil removal (excavation) restrictions. Sub-slab vapor mitigation system installed and maintained in on-site structure.
Yes
05/10/2013
Yes
Cover Technologies (e.g., Capping) Other SSD system is in place
Yes
04/25/2013


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
05/29/2013$92,990.00Northern Maine Development Commission08/06/2013


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The property was formerly a vacant gas station and service garage with known petroleum contamination in downtown Fort Fairfield. Following assessment through EPA Brownfields and environmental liability protection through Maine DEP VRAP, the property was successfully redeveloped as a 24-hour self service gas station with potential office space.

Former Use: The subject property has been operated as a gasoline station since at least the 1940s. The property is currently developed with a 2,024-square foot, single-story building built around 1930 and 12,000-gallon double-walled underground storage tank. Vacant since 2010, the property has been redeveloped by the Mapleton Oil Company as a 24/7 self-service gasoline station with potential office space for their bulk oil operations.
Commercial (.33)
Hazardous
ID Number (if Applicable): REM02194 Enrolled: 03/05/2013
05/10/2013


Top of Page