Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
165882
South Washington Street Kokomo, IN 46901
3.43
34-03-36-404-002.000-002
40.4810705 / -86.133622
5
Bartman, Fred
Bartman.Fred@epa.gov
312-886-0776


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of KokomoBF00E01157INAssessment2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,500.0005/23/201308/20/2013City of KokomoYFY14
Phase II Environmental Assessment$37,833.0005/19/201409/11/2014City of KokomoN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $41,333.00
Leveraged Funding:
Total Funding: $41,333.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Cadmium (Cd)
Chromium (Cr)
Lead
Mercury
Other Metals
PAHS
PCBS
Selenium (Se)
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 3.43
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
No groundwater usage; No residential usage; No drilling or excavation without an approved work plan from the State Environmental Agency; Restoration of soil disturbed as a result of excavation and construction activities.
Yes
04/06/2017
Yes
Cover Technologies (e.g., Capping)
Cap, consisting of 24-inches of clean soil, building foundation or pavement (concrete or asphalt) must be maintained over contaminated soils.
Yes
04/06/2018


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

SME recommends that an ERC to protect visitors to the Property and future receptors be recorded. The ERC would restrict the disturbance of the foundry sand fill materials utilizing an engineering control such as fencing or capping (i.e. a paved parking lot) where the PCB impacted foundry sand fill materials are found within 15 feet of the ground surface, to eliminate the direct contact pathway. In addition, the ERC should restrict the use of the Property to Commercial/Industrial to eliminate the Residential Direct Contact Pathway as well as restrict the use of groundwater.
Hazardous
ID Number (if Applicable): 4161220 Enrolled: 05/12/2017


Top of Page