Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
167241
18640 Walnut Street Southgate, MI 48195
6.6
42.2083896 / -83.2222761
13
Muller, Lori
Muller.Lori@epa.gov
440-250-1735


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Downriver Community ConferenceBF00E01038MIAssessment2012
Downriver Community ConferenceBF00E01500MIAssessment2015
Downriver Community ConferenceBF00E93501MIBCRLF2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,250.0003/04/201304/22/2013Downriver Community ConferenceYFY14
Phase I Environmental Assessment$2,250.0012/01/201401/14/2015Downriver Community ConferenceNFY14
Phase I Environmental Assessment12/01/201401/14/2015Downriver Community ConferenceNFY14
Phase I Environmental Assessment$2,000.0001/24/201401/14/2015Downriver Community ConferenceNFY14
Phase I Environmental Assessment$2,500.0011/01/201602/13/2017Downriver Community ConferenceN
Phase II Environmental Assessment$14,681.0010/31/2013Downriver Community ConferenceN
Supplemental Assessment$14,999.0004/01/201305/23/2013Downriver Community ConferenceN
Supplemental Assessment$1,500.0011/01/201602/13/2017Downriver Community ConferenceN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $40,180.00
Leveraged Funding: $1,600.00
Total Funding: $41,780.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Cadmium (Cd)
Chromium (Cr)
Copper (Cu)
Lead
Other Metals
PAHS
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
07/01/2015$90,039.0012/17/2015Downriver Community ConferenceYes


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 6.6
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding: $90,039.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $90,039.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site was occupied by ASC from the late 1960s until 2008. ASC�s operations were reported to include the manufacture and installation of automobile sunroofs, vehicle painting, detailing, fueling, technical research and development, and engineering and administrative services. One historical gasoline underground storage tank (UST) system was removed from the Site prior a building expansion being constructed over the location. The UST system was replaced with a new system that was located outside the north side of the building and was still located on the Site at the beginning of cleanup activities. The Site has been vacant since 2008. The City of Southgate (the City) involuntarily acquired the site through tax reversion in 2013. Prior to the initiation of the response activities, the Site was vacant and consisted of an approximately 119,000 square foot building surrounded by an asphalt parking lot. The remaining portions of the Site consisted of trees and areas of grass landscaping. The subgrant paid for the costs of the UST removal and cleanup, transformer area cleanup, asbestos abatement prior to demolition, visual inspections of the building slab and foundation removal process, associated environmental sampling conducted during those activities, and the completion of a summary report. The developer paid for the costs of universal waste removal prior to building demolition and building demolition activities.
Hazardous & Petroleum


Top of Page