185781
2 Maritime Plaza Toledo, OH 43604
.31
41.6536169 / -83.52867
9
Stimple, Bradley
stimple.brad@epa.gov
440-250-1717


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of ToledoBF00E01098OHAssessment2012


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$9,500.0002/26/201503/17/2015City of ToledoYFY15


Is Cleanup Necessary? No
EPA Assessment Funding: $9,500.00
Leveraged Funding:
Total Funding: $9,500.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Other Contaminants
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .31
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: This assessment has revealed no evidence of RECs, HRECs, or CRECs in connection with the Site. The consultant completed a non-invasive asbestos inspection that included sampling of drywall, joint compound, plaster,linoleum, ceiling tiles, ceiling surfacing, mastic, glue, grout, pipe wrap and pipe joint wrap. According to the laboratory analysis, four mud fittings located within the basement were determined to contain 30% Chrysotile asbestos. Two of the four fittings appeared to be in good condition and two fittings were observed to be significantlydamaged. The two significantly damaged fittings appear to be residual material from a previous asbestos removal effort. Although not considered a REC, universal waste identified at the Site included approximately 20 mercury thermostats (Westinghouse brand that could not be verified), between 460 and 470 elongated fluorescent light bulbs,approximately 20 large u-shaped fluorescent light bulbs, approximately 21 small u-shaped fluorescent light bulbs and approximately 13 circular fluorescent light bulbs, all of which appeared to be in good condition.
Hazardous