190121
133 Dalton Avenue PITTSFIELD, MA 01201
.61
42.458277 / -73.227697
1
Byrne, James
byrne.james@epa.gov
617-918-1389


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Berkshire Regional Planning CommissionBF96177301MAAssessment2013


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$20,000.0012/11/201406/23/2015Berkshire Regional Planning CommissionYFY22


Is Cleanup Necessary? Yes
EPA Assessment Funding: $20,000.00
Leveraged Funding:
Total Funding: $20,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Petroleum Products
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .61
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: In 2012, a 550-gallon, No. 2 fuel oil underground storage tank (UST) was pumped out and taken out of service during conversion to natural gas for heating purposes. In November 2014, the 550-gallon, No. 2 fuel oil UST was excavated and removed from the Site by Miller�s Petroleum Systems, Inc. of Pittsfield, MA, (Miller�s). Upon removal, a petroleum odor was noted in one small area of the tank grave (specific area unknown) and a small hole was observed in one corner of the tank (specific location of the hole on the UST is unknown). Photoionization detector (PID) readings of the soil exhibited a reading above 100 parts per million by volume (ppmv), which triggered a 72-hour notification condition pursuant to the Massachusetts Contingency Plan (MCP). The exact PID reading is unknown. The UST was transported by Miller�s for off-site disposal. No soil was transported offsite. Groundwater was not encountered during UST removal and clay was reportedly observed underlying the UST.
Commercial (.61)
ID Number (if Applicable): 1-0019599 Enrolled: 11/06/2014


Top of Page