235886
153-157 Sherman Avenue NEW YORK, NY 10034
.28
40.8644704990389 / -73.92314689882247
13
Hom, Benny
Hom.Benny@epa.gov
212-637-3964


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of New YorkBF96287213NYBCRLF2013
City of New YorkBF96295712NYBCRLF2012


Top of Page


Assessment Activities at this Property

There are no current assessment activities.


Is Cleanup Necessary?
EPA Assessment Funding:
Leveraged Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
Mercury
Other Contaminants
Other Metals
SVOCs
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Soil
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
08/01/2016$80,000.0011/30/2019City of New YorkYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: The entirety of the Site was excavated down to a depth of 8 feet or until bedrock was encountered; the elevator pit was excavated down to 13ft; excavation for footings was 10ft; and the detention tank was excavated down to 12 feet 8 inches below sidewalk grade. Transported and disposed a total of 4,915.45 tons of soil/fill material.
Address of Data Source: https://a002-epic.nyc.gov/app/workspace/2542/docrepository
Total ACRES Cleaned Up: .28
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding: $80,000.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $80,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls Information Devices
A Declaration of Covenants and Restrictions with the property deed will be recorded with the County Clerk that includes a listing of Engineering Controls and Institutional Controls and a requirement that management of these controls must be in compliance with an approved Site Management Plan (SMP). Institutional Controls including the following: (1) prohibition of vegetable gardening and farming in residual soil; (2) prohibition of the use of groundwater beneath the site without treatment rendering it safe for the intended use; (3) prohibition of disturbance of residual soil unless it is conducted in accordance with the SMP; and (4) prohibition of higher levels of land usage than the restricted residential uses addressed by this Remedial Action without prior notification and approval by OER.
https://a002-epic.nyc.gov/app/workspace/2542/docrepository
Yes
11/30/2019
Yes
Cover Technologies (e.g., Capping)
As part of development, constructed an engineered Composite Cover System consisting of 24 inches of concrete slab in the area of the gymnasium and 12 inches of concrete slab underlain by 2 inches of mud slab and 6 inches of �-inch bluestone in all other areas. Installed an active Sub-Slab Depressurization System consisting of a
https://a002-epic.nyc.gov/app/workspace/2542/docrepository
Yes
02/26/2019


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
02/10/2015$28,479,000.00City of New York09/01/2019


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Officially opened in Fall of 2019, the new school was designated as TEP's Sherman Campus, facilitating upwards of 450 middle school students from grades 5 through 8. The 62,000 SF middle school building is 7 floors in total, and features four grades of classrooms, a music room, a gymnasium, a cafeteria, a wellness room, two outdoor terraces, a rooftop play yard, and a social work suite.
Commercial (.28)
Hazardous
07/30/2019
Notice of Completion


Top of Page