Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

238195
Map 32, Lots 72, 105A, 108, 223; Map 39, Lot 31 Westbrook, ME 04092
10.29
43.6770252 / -70.37116170000002
1
Dominguez, Jessica
Dominguez.Jessica@epa.gov
617-918-1627


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Greater Portland Council of GovernmentsBF00A00467MEAssessment2018
Greater Portland Council of GovernmentsBF00A00234MEAssessment2016


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$22,000.0008/28/201803/16/2020Greater Portland Council of GovernmentsYFY24


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $22,000.00
Leveraged Funding:
Total Funding: $22,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 10.29
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site comprises five parcels along the edge of the Presumpscot River�s, including an island parcel in the center of the river adjacent west to Saccarappa Falls. The western portion of the Site is currently developed with one 7,344-square foot building that was constructed in 1907 and was formerly used as a powerhouse associated with the adjoining dam; however, it does not currently generate power and is used only to support dam maintenance. This building is not planned to be impacted by the River Walk project and not included in the assessment proposed herein. The central island portion of the Site is accessed via a concrete bridge that connects from the end of Dana Street to the island. The island has remains of former building foundations and a degraded asphalt road that runs from the access bridge to the northwest end of the island. The northeastern portion of the Site is the northern Presumpscot River�s bank. The majority of the Site is heavily vegetated during the growing season with thick Japanese Knotweed. Large portions of the Site have been developed since the early 1700s; early use included saw mills and later use included textile/spinning mills on the island and electrical manufacturing on the northern bank. Textile manufacturing continued on the island through 1959. The mills were dismantled and removed in 1980, and the island has remained vacant since. The southern and northern banks of the Site were developed as multiple businesses including a furniture company, lumber company, Stultz Electric Manufacturing, a machine shop, and some residences. The island and northern bank mills both experienced destructive fires during the industrial history, and the river has flooded on numerous occasions during this industrial history.
Industry (10.29)


Top of Page