Corner of Highway 2 East and 15th Avenue HAVRE, MT 59501
.46
48.5560485 / -109.6558298
2
Benoy, Barbara
Benoy.Barbara@epa.gov
303-312-6760


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Bear Paw Development CorporationBF95809110MTAssessment2020
Bear Paw Development Corporation4B96883601MTBCRLF2022
Bear Paw Development CorporationBF96855501MTAssessment2017


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,688.2708/17/201811/29/2018Bear Paw Development CorporationYFY21
Phase II Environmental Assessment$36,428.0712/01/201809/23/2019Bear Paw Development CorporationN
Phase II Environmental Assessment$8,050.2601/01/202112/31/2021Bear Paw Development Corporation


Is Cleanup Necessary? Yes
EPA Assessment Funding: $47,166.60
Leveraged Funding:
Total Funding: $47,166.60


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Petroleum Products
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
06/14/202201/11/2024Bear Paw Development CorporationYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .46
Number of Cleanup Jobs Leveraged: 4
EPA Cleanup Funding:
Leveraged Funding: $45,463.30
Cost Share Funding:
Total Funding: $45,463.30


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Reduce energy usePractices to reduce energy use may include limiting or eliminating idling of heavy equipment; maximizing use of machinery with advanced energy saving controls; use of cleaner fuels to power machinery and auxiliary equipment; onsite carbon sequestration (e.g., soil amendments, revegetation); reducing fuel consumption to save energy; and maximizing use of renewable energy.
Reduce waste and manage materials sustainablyPractices to reduce water and manage materials sustainably may include minimizing consumption of virgin materials; minimizing waste generation; use of recycled products and local materials; beneficially reusing waste materials (e.g. concrete made with coal combustion products replacing a portion of cement); and segregating and reusing or recycling materials, products, and infrastructure (e.g. soil, construction and demolition debris, buildings).


Top of Page


Institutional and Engineering Controls

No
No
No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Gilbert Property is a large corner lot with a great on Highway 2 in Havre. There are no structures on the lot except for a double-sided billboard. Currently, there is an individual that would like to purchase the property to construct a new commercial building; however, due to the perceived contamination at the site, the buyer is not willing to purchase the property until assessment is completed. The landowner conducted a Phase I assessment to help facilitate the sale of the property. The Phase I identified RECs including petroleum. The petroleum REC was identified due to Fire Safety records that list tanks being removed from the property in 1973. The landowner also mentioned that there used to be a gas station operating at the site back in the 1950s. The landowner hopes to sell the property so that it can be redeveloped for commercial use. During petroleum sampling conducted in 2019, petroleum was found in soil on the property. The groundwater did not contain concentrations of petroleum above the MT RBSLs. The results of the assessment were submitted to the MT DEQ and the landowner is waiting for further direction from DEQ as well as a determination from the Montana State Petroleum Tank Release Compensation Board regarding Petrofund eligibility. The Petrofund is anticipated to review eligibility for this site in January of 2020, and DEQ direction will follow.

Former Use: The Gilbert Property is a corner lot on Highway 2 in Havre, MT. The lot is in a great , and the current landowner has an interested buyer who would like to purchase the property and construct a commercial building on it. The property is said to have been a gas station in the 1950s, and Fire Safety Records from the local fire department show that there was a UST removed from the property in 1973. Currently, the property is vacant except for one large billboard on the corner of the property.
Commercial (.46)
01/11/2024


Top of Page