2501 South 4th Avenue
Private
238603
310 East 35th Street TUCSON, AZ 85713
.15
118-25-3010
32.193312329330155 / -110.9647390669979
7
Garcia, Jose
Garcia.Jose@epa.gov
213-244-1811


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of South TucsonBF99T61301AZAssessment2017
City of South TucsonBF98T07001AZAssessment2020


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$4,300.0003/09/202205/18/2022City of South Tucson
Phase I Environmental Assessment$4,800.0008/03/201811/14/2018City of South TucsonYFY19
Phase II Environmental Assessment$20,390.7507/15/202202/24/2023City of South Tucson
Supplemental Assessment$7,200.0005/05/202306/06/2023City of South Tucson


Is Cleanup Necessary? Yes
EPA Assessment Funding: $36,690.75
Leveraged Funding:
Total Funding: $36,690.75


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Lead
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Based on the results of this investigation, the presence of lead contamination detected in the soil has been delineated to an approximately 108-square foot area spanning approximately 12 feet north to south and nine feet east to west, and approximately 0.5 feet bgs. Terracon recommends the top 0.5 feet of soil be excavated and disposed of at an appropriately licensed landfill in accordance with local, state, and federal regulations. Terracon recommends approximately two cubic yards of soil be removed from the site. Prior to disposal an additional sample may need to be collected from the excavated soil and analyzed based on selected landfill requirements.
Address of Data Source:
Total ACRES Cleaned Up: .15
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate demolition or cleanup activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Institutional and Engineering Controls

No
Yes
Security (e.g., Guard, Fences)
Fences at the site.


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site consisted of approximately 0.6 acres of land and was located at 310 East 35th Street. The Site was generally flat, and rocks were placed throughout the Site. A circular outline was observed in the southern portion along the western boundary of the Site. Mr. Brian Hedlund, the Site Owner, indicated the outline represented the location of a former cesspool. Along the eastern boundary, Mr. Hedlund also indicated he had observed paint and stucco material runoff from the eastern adjoining property, a single-family residence. Two former fence poles were observed along the eastern boundary. Three pole mounted transformers were located in the alley near the southeastern corner of the Site. Former Use: The Site was approximately 0.46 acres of vacant land. The Site was generally flat, and rocks were placed to outline an unpaved driveway in the western portion and were placed throughout the Site. An electrical meter, electrical box, and concrete-lined utilities vault were located in the southwest corner of the Site. A concrete debris pile was located along the southern portion of the western boundary of the Site. An irrigation pipe was observed in a planter box located in the northwestern portion of the Site. Multiple shapes were drawn in the soil in the northeast portion of the Site, which, according to Mr. Brian Hedlund, the Site owner, represented the former locations of the apartment building and basement stairs, the wash house, and two cesspools. Three pole-mounted transformers were located in the alley near the southeast corner of the Site. Two electrical boxes and a pad-mounted transformer was located near the southwest corner of the Site along South 4th Avenue.
Commercial (.6) Residential (.6)