Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

241796
222 Oak Street BRISTOL, VA 24201
1
36.599902 / -82.186114
9


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R3 TBA - Virginia (STAG Funded)n/aVATBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$9,000.0009/04/201910/31/2019R3 TBA - Virginia (STAG Funded)YFY20


Is Cleanup Necessary? Yes
EPA Assessment Funding: $9,000.00
Leveraged Funding:
Total Funding: $9,000.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Building Materials
Air
Soil
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 1
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

EPA conducted a Phase I Environmental Assessment at the property. The Phase I Environmental Assessment identified the potential presence of lead-based paint, the potential presence of asbestos-containing material, the potential presence of polychlorinated biphenyl (PCB)-containing caulk in the windows, and the presence of mold has been identified as Business Environmental Risks (BERs) for the Site.

Former Use: The Site consists of an original two-story school building (with a partial basement) built between 1900 and 1903 and a second two-story (consisting of a first floor and basement) building that was added off the northwest section of the original building in the 1930s. Both buildings have a combined square footage of approximately 7,000 square feet. After the closure of the school, the property was used for office space and storage from 1975 to 2013. The building has been vacant since 2013.
Greenspace (1)


Top of Page