Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

NOMA Tulsa
Private
241850
2215 and 2233 E. 11th Street, TULSA, OK 74104
4
Multiple
36.148284000000004 / -95.958756
1
Williams, Denise
Williams.Denise@epa.gov
214-665-9749


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of TulsaBF01F48401OKAssessment2018


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$10,450.0003/14/201911/20/2019City of TulsaYFY20
Supplemental Assessment$44,039.0006/21/201911/20/2019City of TulsaN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $54,489.00
Leveraged Funding:
Total Funding: $54,489.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Adoption of building codes that consider impacts from extreme weather events and natural disastersBuilding codes can encourage implementation of mitigation and adaptation techniques for extreme weather events and natural disasters. Codes may require that infrastructure be planned and built to avoid or minimize future damage or costly repairs from increased frequency and intensity of flooding, drought, wildfires, and other projected extreme weather/disaster events. Codes may also lead to energy savings for commercial and residential buildings by specifying minimum requirements for building components such as insulation, water use, heating and cooling systems, lighting, windows, and ventilation systems. Effective building code requirements may vary regionally due to differences in natural hazards.


Top of Page


Contaminants and Media


Petroleum Products
Cleaned Up
Soil
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
08/21/201912/30/2019City of TulsaNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 4
Number of Cleanup Jobs Leveraged: 3
EPA Cleanup Funding:
Leveraged Funding: $25,000.00
Cost Share Funding:
Total Funding: $25,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Reduce waste and manage materials sustainablyPractices to reduce water and manage materials sustainably may include minimizing consumption of virgin materials; minimizing waste generation; use of recycled products and local materials; beneficially reusing waste materials (e.g. concrete made with coal combustion products replacing a portion of cement); and segregating and reusing or recycling materials, products, and infrastructure (e.g. soil, construction and demolition debris, buildings).


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
11/18/2021$60,000,000.00City of Tulsa02/29/2024
11/18/2021$5,000,000.00City of Tulsa02/29/2024


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
Incorporate and encourage multi-modal transit opportunities in redevelopment activitiesPlanning, designing and building streets that enable access for all users, including pedestrians, bicyclists, motorists and transit riders. Brownfield redevelopment projects can incorporate sidewalks in their plans to allow for pedestrian traffic, outdoor public spaces to encourage community gatherings, and bicycle parking, bike share rentals, and bike trails to encourage biking throughout the community.


Top of Page


Additional Property Attributes

Former Use: This property was formerly operated as a welding school and is being redeveloped with mixed use commercial/residential. https://tulsaworld.com/business/local/watch-now-ground-broken-for-60-million-mixed-use-market-district-project/article_9cb8d4ee-43c9-11ec-872b-2f4dd5ad2416.html
Industry (4)
Petroleum
A tank and bedding were also removed as part of the Phase II ESA


Top of Page