Profile Information

206 and 214 W Riverside Ave
Private
243953
206 and 214 W Riverside Ave SPOKANE, WA 99201
.66
35184.0917 and 35184.0918
47.65805868815182 / -117.41394487401271
5
Perkins, Brandon
Perkins.Brandon@epa.gov
206-553-6396


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Spokane, City ofBF01J65801WAAssessment2019


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$10,916.5011/02/202011/30/2020Spokane, City ofN
Phase II Environmental Assessment$32,573.1208/12/202010/21/2020Spokane, City ofYFY21
Phase II Environmental Assessment$2,053.0008/12/202010/21/2020Spokane, City ofNFY21


Is Cleanup Necessary? Yes
EPA Assessment Funding: $45,542.62
Leveraged Funding:
Total Funding: $45,542.62


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Cadmium (Cd)
Chromium (Cr)
Lead
Mercury
Other Metals
PAHS
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Cleaned Up
NOT Cleaned up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Soil
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
02/08/202103/04/2021Spokane, City ofNo


Cleanup/Treatment Implemented: N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .66
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding:
Leveraged Funding: $34,500.00
Cost Share Funding:
Total Funding: $34,500.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
03/22/2021$22,000,000.00Spokane, City of


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

A hotel and retail businesses were located on both parcels in the early 1900's. The hotel and furniture stores occupied the west parcel until the 1980's. A gasoline service station operated on the eastern parcel from the 1930's until around 1991 when it was demolished, and the current bank building was constructed. The surrounding properties have been commercially developed for over 130 years. When the service station was to be demolished in 1990 to 1991, environmental assessments identified petroleum contaminated soils around the underground storage tank (UST) system. Five UST's were removed along with approximately 130 cubic yards of soil. Prior to construction of the current building, soils contaminated with petroleum and lead that exceeded the MTCA Method A Cleanup Levels were discovered. Approximately 40 more yards of contaminated soils were removed from the property. The site is no longer an active contaminated site with the Washington State Department of Ecology (WSDOE). The previous LUST listing is closed. The Phase II ESA analytical data indicate that total TEQ PAHs (3 samples) and benzene concentrations (one sample) exceed the MTCA Method A CULs. No asbestos containing materials or lead-paint based paints were found in the building materials.

Cleanup commended at the Site as an Independent Remedial Action on February 8 2021 and was completed on February 21. 38 tons of largely PAH impacted soils were hauled offsite for disposal. The Site was issued an NFA on March 4. Construction is slated to start on March 18. The 214 Riverside project - to which it's referred in the application - will have 139 one- and two-bedroom units, 63 parking spaces and 1,250 square feet of lobby and amenity space. The construction cost is an estimated $22 million,
Commercial (.66)
Hazardous & Petroleum
03/04/2021


Top of Page