Private
248829
55 Main Street WELLS RIVER, VT 05081
.36
44.15215999547027 / -72.04633500987958
1
Peterson, Alan
Peterson.Alan@epa.gov
617-918-1022


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Two Rivers-Ottauquechee Regional CommissionBF00A00420VTAssessment2019


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning02/15/2022Two Rivers-Ottauquechee Regional Commission
Phase I Environmental Assessment11/01/202012/10/2020Two Rivers-Ottauquechee Regional CommissionN
Phase II Environmental Assessment$5,476.4005/18/202108/02/2021Two Rivers-Ottauquechee Regional CommissionN
Phase II Environmental Assessment05/18/202108/02/2021Two Rivers-Ottauquechee Regional CommissionN
Supplemental Assessment$1,589.5003/19/202105/18/2021Two Rivers-Ottauquechee Regional CommissionYFY22
Supplemental Assessment01/21/202103/02/2021Two Rivers-Ottauquechee Regional CommissionNFY22
Supplemental Assessment03/19/202105/18/2021Two Rivers-Ottauquechee Regional CommissionYFY22
Supplemental Assessment$14,114.0010/15/202102/08/2022Two Rivers-Ottauquechee Regional CommissionFY22
Supplemental Assessment$2,020.0008/11/202110/15/2021Two Rivers-Ottauquechee Regional CommissionNFY22


Is Cleanup Necessary? Yes
EPA Assessment Funding: $23,199.90
Leveraged Funding: $17,889.00
Total Funding: $41,088.90


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
Petroleum Products
Soil
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
10/13/2022Two Rivers-Ottauquechee Regional CommissionNo
10/13/2022Two Rivers-Ottauquechee Regional CommissionNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: A sub-slab depressurization system will be installed to mitigate impacts to indoor air.
Address of Data Source:
Total ACRES Cleaned Up: .36
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding:
Leveraged Funding: $133,947.77
Cost Share Funding:
Total Funding: $133,947.77


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Government Controls
No
Yes
Cover Technologies (e.g., Capping)
Contaminated soils will be capped with asphalt pavement, sidewalks, and landscaped engineered barriers. A vapor barrier will be installed inside the building.
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The property is a former gas station and auto repair shop, both of which closed in 2013. The UST system and pump islands were removed in 2018. Prior environmental assessments of the property showed soil and groundwater were impacted by petroleum releases. Groundwater has been assessed for petroleum related VOCs only and has not been assessed for chlorinated solvents, waste oil contaminants, metals or tetraethyllead. Residual petroleum contamination remains in soil within 30 feet of the Subject Property building and to date soil gas concentrations have not been assessed. A Phase I was completed in December 2020, and a Phase II was completed in August 2021. VOC concentrations in soil gas exceeded standards, and the state has requested further investigation to determine whether a nearby residential property is being impacted. A Supplemental Site Investigation was conducted; the nearby residential property does not appear to have been impacted by the site. Using leveraged state funding, and ECAA and CAP were prepared. The CAP was approved, and the state offered a grant to cover most of the cost of CAP implementation. Cleanup is now underway. The property will be redeveloped as a dental clinic, which hopes to open in fall 2023.
Commercial (.36)
Hazardous