Cleanup Activities
There are no current cleanup activities.
Cleanup/Treatment Implemented:
N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
A total of twenty - five (25) samples of suspect ACM were collected from the site. As shown in Table 1 below, the following materials were determined to be ACM.
Table 1 - Positive ACMs
Material Functional Space Quantity Type & Percent Asbestos
9" x 9" Black Floor Tile Throughout Main Floor 4,500 sqft 4% Chrysotile
Grey Pebble Pattern
Linoleum 2nd Floor Hall 1,000 sqft 3% Chrysotile
Window Caulk Front Window Frames 150 lnft 4% Chrysotile
Black Tar Felt Roof 4,500 sqft 15% Chrysotile
Roof Flashing Roof 280 lnft 4% Chrysotile
Address of Data Source:
Total ACRES Cleaned Up: .1
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:
Top of Page