Profile Information

251343
South River Rd. PUTNEY, VT 05346
20
42.97917618096754 / -72.47724074229018
1
Ferrari, Joe
Ferrari.Joe@epa.gov
6179181105


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Windham Regional CommissionBF00A00418VTAssessment2019


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$39,475.0012/17/202106/29/2022Windham Regional CommissionYFY22


Is Cleanup Necessary? No
EPA Assessment Funding: $39,475.00
Leveraged Funding:
Total Funding: $39,475.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Controlled Substances
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 20
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site is in a rural part of the Town of Putney. It is on the south side of the railroad, River Road South, and Interstate I-91. Access to the Site is from the south side of River Road on a gravel driveway just east of the I-91 overpass. Site access is restricted via a locked roadway gate, partial fencing, heavily wooded land and steep slopes that extend to the adjoining Connecticut River. Active railway tracks abut the Site's northern boundary and the access road has a private crossing over the tracks. Much of the Site is open meadow and grassland over the capped landfill and the field to its south. The unused pit is densely grown in with young saplings. The land adjacent to the Connecticut River is heavily wooded. Nearby properties included rural residences, a dog kennel, and wooded land. The ANR Natural Resources Atlas
depicts the Site in a rural (non-urban background) area. A Phase I was completed in 2020 and updated in December 2021. The new owner plans to develop 3 acres of the site for a 500 kW solar array. A Phase Ii was completed and all RECs are below the allowable limit. No Cleanup is necessary.
Greenspace (20)
Hazardous


Top of Page