256113
300-304 Main Street NOEL, MO 64854
.25
36.54512458071175 / -94.48562045948364
7


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Missouri Department of Natural ResourcesRP98727707MOSection 128(a) State/Tribal2021
Missouri Department of Natural Resources4W97798801MOSection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$4,104.2205/11/202206/21/2022Missouri Department of Natural ResourcesYFY24
Phase II Environmental Assessment$5,773.0007/18/202308/23/2023Missouri Department of Natural ResourcesN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $9,877.22
Leveraged Funding:
Total Funding: $9,877.22


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .25
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

This site, described as "burned, but rebuildable" [structures], consists of three adjacent buildings. Former uses of the site included a clothing store, textiles, hardware store, and furniture store. An asbestos survey was conducted in 2021, with floor tile being the only positive result. A drycleaner facility was located cross-gradient at 315 Gratz Avenue as late as the 1980s. ACM is present in the red and white floor tiles of the building at 304 Main Street. LBP is present in the building at 304 Main Street. A Phase II assessment is recommended to investigate possible contamination in the soil and groundwater from the historic drycleaner at 315 Gratz Avenue. ACM should be removed from the 304 Main Street building by a licensed asbestos abatement contractor and properly disposed prior to building demolition or renovation. Structures containing LBP may be disposed as construction waste if the building is demolished. If the building is renovated, the LBP should be abated by a licensed professional. Two borings were advanced at the site to assess environmental impacts to soil as a result of historic activities at the subject property. No VOCs were detected in either sample. Groundwater was unable to be sampled as refusal was encounterd at 3 feet.
Commercial (.25)


Top of Page