Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Private
256423
203 W Franklin St WARRENTON, NC 27589
.12
36.397061993553 / -78.157067977896
1
Hayes, David
Hayes.David@epa.gov
404-562-8071


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Warrenton - Town of WarrentonBF02D08021NCAssessment2021


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$5,500.0003/01/202306/29/2023Warrenton - Town of WarrentonYFY24


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $5,500.00
Leveraged Funding:
Total Funding: $5,500.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Adoption of building codes that consider impacts from extreme weather events and natural disastersBuilding codes can encourage implementation of mitigation and adaptation techniques for extreme weather events and natural disasters. Codes may require that infrastructure be planned and built to avoid or minimize future damage or costly repairs from increased frequency and intensity of flooding, drought, wildfires, and other projected extreme weather/disaster events. Codes may also lead to energy savings for commercial and residential buildings by specifying minimum requirements for building components such as insulation, water use, heating and cooling systems, lighting, windows, and ventilation systems. Effective building code requirements may vary regionally due to differences in natural hazards.
Phase I and Phase II ESAs that consider impacts from extreme weather events and natural disastersPhase I ESAs may consider current and on-going impacts from extreme weather events and natural disasters and consider future impacts to the site or area. For example, an investigation of the site history can include an investigation of site vulnerabilities based on historical and recent extreme weather patterns and events (e.g., floods and drought). Phase II ESAs may include use of renewable energy, incorporating remote sensing capabilities, maximize reuse of existing wells (as appropriate) and/or design wells for future reuse, use of field test kits when possible, use of local laboratories when possible, and use of appropriate sized equipment for the project.
Evaluate Reuse options that consider impacts from extreme weather events and natural disastersDiscussion of observed and forecasted natural hazard conditions and the associated site-specific risk are part of any reuse considerations. Both current and forecasted extreme weather events and natural disasters may impact the effectiveness of a remedial alternative.


Top of Page


Contaminants and Media


Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .12
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former All Saints church property that is planned to be redeveloped into a community center.
Commercial (.12)


Top of Page