115 North Spring Street PALMYRA, MO 63461
.8
39.799882370212 / -91.525355400944
6
Harrington, Jonathan
harrington.jonathan@epa.gov
: (913) 551-7894


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Missouri Department of Natural ResourcesBF97782501MOAssessment2020
Missouri Department of Natural Resources4W97798801MOSection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,197.0603/14/202210/03/2022Missouri Department of Natural ResourcesYFY24
Phase II Environmental Assessment$15,463.9006/01/202307/28/2023Missouri Department of Natural Resources


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $17,660.96
Leveraged Funding:
Total Funding: $17,660.96


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Lead
Other Metals
Petroleum Products
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .8
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The site is located in the city of Palmyra and is primarily occupied by a vacant 6,500 square-foot building that operated as a power plant from 1888 to 2003. The power plant produced electricity for the city using diesel generators. At least two above-ground storage tanks (ASTs) have been on the property.

Potential impact to the site from the long-term use of diesel-fueled generators, including significant staining associated with the generators and associated operations, and an open pathway to the subsurface via the natural spring opening in the site building, is considered a recognized environmental condition.

A total of 6 soil borings were advanced and eventually converted into groundwater temporary sampling points to evaluate potential releases in association with the REC. Arsenic and lead were found to be above default target levels (DTLs) and allowable background concentrations in soil. Arsenic, barium, and chromium were found to be above DTLs in groundwater. TPH-DRO was also above DTLs in one soil sample. Polyaromatic hydrocarbons were detected in soil and groundwater, but below risk-based target levels.
Industry (.8)


Top of Page