36 Pleasant Street ANSONIA, CT 06401
.48
41.348755785679 / -73.076967852653
3
Deng, Katy
Deng.Katy@epa.gov
NOT_FOUND


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Naugatuck Valley Council of GovernmentsBF00A00995CTAssessment2021


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,700.0004/05/202306/20/2023Naugatuck Valley Council of GovernmentsYFY23
Phase II Environmental Assessment$15,777.5008/04/202309/06/2023Naugatuck Valley Council of Governments


Is Cleanup Necessary? Yes
EPA Assessment Funding: $18,477.50
Leveraged Funding:
Total Funding: $18,477.50


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Arsenic
Copper (Cu)
Lead
Mercury
Other Metals
Petroleum Products
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .48
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site consists of one parcel of land totaling 0.48 acres that is improved with one main building totaling 3,600 square feet and an attached storage garage totaling 1,290 square feet. According to historical Sanborn Fire Insurance maps, the main building and garage were developed between 1911 and 1924. The remainder of the Site consists of paved parking areas and lightly vegetated areas along the northern border of the Site. The Site is currently owned by 36 Pleasant Street LLC and is used as storage space by the owner. The Site was initially developed sometime between 1911 and 1924 by Ansonia Foundry Co. and was used as a brass and aluminum foundry, to make cast moldings for the plastic industry in the early 1900s. The Site was then occupied by Kisluk Manufacturing Company from at least 1964 to 1972 and was occupied by Advanced Precision Casting Company (APC) from at least 1977 to 2019, when it was acquired by the current owner. Historical site operations under APC involved those associated with a foundry to create aluminum cast molds for the plastic industry. General site processes involved melting aluminum in gas furnaces which was then poured into sand forms. The heated liquid metal would be left in the mold to cool and harden, then finished using sand blasting. Wastes historically generated at the Site during foundry processes included casting sand and aluminum chips. Casting sand was stockpiled on-site then shipped off-site for landfill disposal, and aluminum chips were stored in drums and taken back by the supplier to be reclaimed.
Industry (.48)


Top of Page