Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

257258
107 Lake Harbour Drive RIDGELAND, MS 39157
.73
072I-31B-031/00.00
32.414039943769 / -90.138264459004
3
Janovitz, Sara
Janovitz.Sara@epa.gov
404-562-9870


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
CENTRAL MS PLANNING & DEVBF02D30522MSAssessment2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$6,999.7209/07/202310/25/2023CENTRAL MS PLANNING & DEVYFY25


Is Cleanup Necessary? Yes
EPA Assessment Funding: $6,999.72
Leveraged Funding:
Total Funding: $6,999.72


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: https://opcgis.deq.state.ms.us/enOnline/get_doc.aspx?dtpdf&id1701550
Address of Data Source: https://opcgis.deq.state.ms.us/enOnline/get_doc.aspx?dtpdf&id1701550
Total ACRES Cleaned Up: .73
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The ACM survey was performed on October 9, 2023, by a PPM (www.ppmco.com) State of Mississippi Certified Asbestos Inspector. PPM's scope of work included a visual survey and sampling of accessible suspect ACMs on the interior and exterior areas of the building. The inspection included a visual assessment of suspect ACMs and subsequent sampling and analysis. The building was inspected for the presence of suspect ACM.

According to the analytical results, seven of the 73 samples collected were identified to contain asbestos. This conclusion is based on the EPA definition of an ACM as material composed of ".greater than 1% asbestos."

- Tan 12"x12" Floor Tile (DT-01 and DT-02). The tan 12" x 12" floor tile is located in the interior of the building and contains 2 percent chrysotile asbestos.
The associated yellow glue is not asbestos-containing.
- Roof Flashing Material (DT-08 through DT-10). The roof flashing material is located on the exterior of the building and contains 8 percent chrysotile asbestos.
- Off-White 12"x12" Floor Tile (SI-01 and SI-02). The off-white 12" x 12" floor tile is located in the interior of the building and contains 3 percent chrysotile asbestos. The associated yellow glue is not asbestos-containing.

Site has been abated and demolished and is now ready for reuse (https://opcgis.deq.state.ms.us/enOnline/get_doc.aspx?dtpdf&id1701550).

https://opcgis.deq.state.ms.us/enOnline/get_doc.aspx?dtpdf&id1701550


Top of Page