Profile Information

Private
257539
4401 Shreve Avenue SAINT LOUIS, MO 63115
.14
439101050
38.682418991198 / -90.239792964533
1
Eaton, Brad
Eaton.Brad@epa.gov
913-551-7265


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Missouri Department of Natural ResourcesRP98727703MOSection 128(a) State/Tribal2009


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$1,620.2509/22/201001/18/2011Missouri Department of Natural ResourcesYFY24
Phase II Environmental Assessment$5,994.6103/15/201105/26/2011Missouri Department of Natural ResourcesN
Supplemental Assessment$20,264.2807/12/201104/05/2012Missouri Department of Natural ResourcesN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $27,879.14
Leveraged Funding:
Total Funding: $27,879.14


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
PAHS
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Building Materials
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .14
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The St. Louis Development Corporation applied for a brownfields assessment on behalf of the owner. The owner purchased the site for use as a day care. An environmental assessment was necessary because environmental uncertainties are discouraging redevelopment. The Phase I identified as recognized environmental conditions the former use of the site as a gas station and the possibility of underground storage tanks (USTs) remaining on site, an adjacent property which was formerly a gas station and is currently conducting groundwater monitoring, and a former dry cleaners on an adjacent property. The Phase II identified asbestos-containing material (ACM) and lead-based paint (LBP) in the building. During the Supplemental Assessment, four USTs were removed for sampling purposes and further groundwater sampling was conducted. A risk assessment was conducted for soil and groundwater, the conclusion of which was that the site currently meets standards for residential use. Because the site will be redeveloped as a day care center, ACM and LBP must be addressed, so cleanup of the two contaminants is required. The abatement technique to be used for ACM and LBP is unknown, so at this point it is not known whether any material will be left in place and encapsulated, requiring institutional or environmental controls.
Commercial (.14)