Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Front Street Phase III Development
257800
33 West Presumpscot Street PORTLAND, ME 04103
.34
Lots 9 and 10 of Block E, Tax Map 167
43.681058228799 / -70.262049189891
1
Peterson, Alan
Peterson.Alan@epa.gov
617-918-1022


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
PORTLAND HOUSING DEVELOPMENT CORPORATION4B00A01557MECleanup2024
Portland, City ofBF97145801MEBCRLF2006


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment03/01/202308/31/2023Portland, City ofYFY24


Is Cleanup Necessary? Yes
EPA Assessment Funding:
Leveraged Funding:
Total Funding: $0.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Lead
Other Metals
PAHS
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
12/02/2024$100.00PORTLAND HOUSING DEVELOPMENT CORPORATIONNo


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .34
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding: $100.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $100.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Selection and design of cleanup considered the site's vulnerabilities to extreme weather events and natural disastersVulnerability describes the degree to which natural, built, and human systems are at risk of exposure to impacts from extreme weather events and natural disasters.
Reduce energy usePractices to reduce energy use may include limiting or eliminating idling of heavy equipment; maximizing use of machinery with advanced energy saving controls; use of cleaner fuels to power machinery and auxiliary equipment; onsite carbon sequestration (e.g., soil amendments, revegetation); reducing fuel consumption to save energy; and maximizing use of renewable energy.
Reduce waste and manage materials sustainablyPractices to reduce water and manage materials sustainably may include minimizing consumption of virgin materials; minimizing waste generation; use of recycled products and local materials; beneficially reusing waste materials (e.g. concrete made with coal combustion products replacing a portion of cement); and segregating and reusing or recycling materials, products, and infrastructure (e.g. soil, construction and demolition debris, buildings).


Top of Page


Institutional and Engineering Controls

Yes
Proprietary Controls Information Devices
Post-Cover System Maintenance Plan, Environmental Media Management Plan, Declaration of Environmental Covenant
No
Yes
Cover Technologies (e.g., Capping)
TBD
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Currently developed with a residential structure. Proposed for reuse as affordable housing.
Residential (.34)
ID Number (if Applicable): REM0332 Enrolled:


Top of Page