Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Tamara Cooksey, Juanita Rape, Marble City Store
Government
258231
Seminole Ave/Hwy 17 North MARBLE CITY, OK 74945
3
35.57985479921572 / -94.82056162538358
2
Cosma, Selena
Cosma.Selena@epa.gov
214-665-6586


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Cherokee Nation4W02F24101OKSection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$13,546.0006/21/2023Cherokee Nation


Is Cleanup Necessary? Yes
EPA Assessment Funding: $13,546.00
Leveraged Funding:
Total Funding: $13,546.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
Adoption of building codes that consider impacts from extreme weather events and natural disastersBuilding codes can encourage implementation of mitigation and adaptation techniques for extreme weather events and natural disasters. Codes may require that infrastructure be planned and built to avoid or minimize future damage or costly repairs from increased frequency and intensity of flooding, drought, wildfires, and other projected extreme weather/disaster events. Codes may also lead to energy savings for commercial and residential buildings by specifying minimum requirements for building components such as insulation, water use, heating and cooling systems, lighting, windows, and ventilation systems. Effective building code requirements may vary regionally due to differences in natural hazards.


Top of Page


Contaminants and Media


Lead
Mercury
Other Metals
Petroleum Products
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
01/20/2023Cherokee NationNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 3
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding:
Leveraged Funding: $100,000.00
Cost Share Funding:
Total Funding: $100,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Design of cleanup allowed for siting of weather-related and disaster-related resiliency measures in site reuseThe capacity of a system to maintain function in the face of stresses imposed by extreme weather events and natural disasters and to adapt the system to be better prepared for future related impacts.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
01/26/2023$8,000,000.00Cherokee Nation


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Past use on the east property was a school and then the building was used for a food pantry for the community.
The west properties were used for commercial and residential use.
The future use is the development of a community center and a cultural center.
Commercial (2.5) Residential (.5)


Top of Page