Cleanup Activities
There are no current cleanup activities.
Cleanup/Treatment Implemented:
N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
? The results of the asbestos survey indicate ACM were identified in the Clay County Courthouse, which will require removal by a licensed abatement contractor prior to renovation activities. These materials include:
* Black Tar Coating on Non-ACM Black Pipe Insulation (HA5) - 50 Linear Feet
* Pipe Insulation (HA6) - 100 Linear Feet
* 6" x 6" Brown Speckled Vinyl Floor Tile and Black Mastic (HA19) - 250 Square Feet
* 6" x 6" Green Speckled Vinyl Floor Tile and Black Mastic (HA20) - 2,000 Square Feet
* Black Mastic Associated with Non-ACM 6" x 6" Dark Green Speckled Vinyl Floor Tile - 20 Square Feet
* Black Mastic Associated with Non-ACM 6" x 6" Tan Speckled Vinyl Floor Tile (HA22) - 1,000 Square Feet
* 6" x 6" Red Speckled Vinyl Floor Tile (HA27) - 50 Square Feet
* 6" x 6" Brown/Red Speckled Vinyl Floor Tile and Black Mastic (HA28) - 700 Square Feet
* Exterior Window Caulk (HA31) - 200 Linear Feet
? Roofing materials were not sampled as part of this inspection, and therefore are Assumed ACM. These materials will need to be sampled if impacted by future renovations to determine asbestos content.
Address of Data Source:
Total ACRES Cleaned Up: .69
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:
Top of Page