Profile Information

1000 Block of South 4th Street
Private
258523
1000 Block of South 4th Street CLINTON, IA 52732
.5
80-59700001; 80-59730000; 80-59740000; 80-59750000; 80-59620000
41.834724001632 / -90.19327204805
2
Morris, Jennifer
Morris.Jennifer@epa.gov
913-551-7341


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of Clinton4B96705601IACleanup2023
East Central Intergovernmental Association4B96709001IABCRLF2023
East Central Intergovernmental AssociationBF97764501IABCRLF2018


Top of Page


Assessment Activities at this Property

There are no current assessment activities.


Is Cleanup Necessary?
EPA Assessment Funding:
Leveraged Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Asbestos
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
08/11/2023$500,000.0008/07/2024City of ClintonYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: RACM demolition
Address of Data Source:
Total ACRES Cleaned Up: .5
Number of Cleanup Jobs Leveraged: .5
EPA Cleanup Funding: $500,000.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $500,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
OtherEnter additional activities
Reduce energy usePractices to reduce energy use may include limiting or eliminating idling of heavy equipment; maximizing use of machinery with advanced energy saving controls; use of cleaner fuels to power machinery and auxiliary equipment; onsite carbon sequestration (e.g., soil amendments, revegetation); reducing fuel consumption to save energy; and maximizing use of renewable energy.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
04/01/2025$27,650.00East Central Intergovernmental Association
11/01/2024$25,000.00East Central Intergovernmental Association


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Associated with ACRES ID #: 253090, 227103, 227104, 227105, and 253949.
1000 Block of S 4th St consisted of 1000, 1002, 1004, 1006-1008, and 1010-1012 S 4th St. ECIA FY18 & FY23 RLF Cleanup funds were utilized on the entire block. The city received a cleanup grant and utilized funds on 1002 & 1006-1008 S 4th St only.

The block consisted of five parcels containing five 2 and 3 story brick buildings constructed between 1868 and 1912 that were used for retail purposes on the first floor and residential apartments on the second and third floors. Retail occupants included a grocery, laundromat, hardware store, resale shop, upholstery store, furniture and antique store, used clothing store, offices, barber shop, drug store, restaurants, taverns and meeting hall. The buildings were vacant over a decade and in disrepair. The structures were deemed unsafe with sagging roofs and unstable floors making safe asbestos abatement impossible therefore a RACM demolition was required to remediate the sites and eliminate potential exposure to asbestos. Due to condition of the buildings testing for ACM was not completed on all of the structures but assumed given the age of the structures to be present.

RACM Demolition was started August 2023 and completed in May 2024. Site was graded, seeded and made ready for reuse. BTS Inc. acquired 3 of the parcels from the city in November 2024 and began construction of four attached townhomes with 1,5000 SF of living space and two car garage each. Redevelopment project completed May 2025. Open house held 5/30/25. Total redevelopment investment $1,227,650 investment. Homebuyers will be eligible to receive a $7,500 homebuyer grant.

City injected an additional $27,650 in infrastructure (new access street/alley and stormwater drain connecting new townhomes to 10th Ave S.) Installation completed April 2025.

Parcel #80-5970000 was transferred back to the prior owner for expansion of a commercial business. Parcel #8059620000 (1010-1012 S 4th St) is currently owned by the city. The city is seeking a developer for the remaining parcel.
Hazardous
05/28/2024