259585
1018 Main Street BRIDGEPORT, NE 69336
.2
1000002042
41.664492018365 / -103.099218962295
3
Morris, Jennifer
Morris.Jennifer@epa.gov
913-551-7341


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Nebraska Department of Environment and Energy4W97798601NESection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$5,972.5104/06/202307/19/2023Nebraska Department of Environment and EnergyYFY24
Supplemental Assessment$7,336.4704/06/202307/19/2023Nebraska Department of Environment and EnergyN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $13,308.98
Leveraged Funding:
Total Funding: $13,308.98


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
Other Contaminants
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .2
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The subject property historically served as an opera house in 1931-1942 and most recently as an Eagle's Lodge from 1970 to 2012. Currently the property is vacant and being used to store miscellaneous items from past historic uses. A Phase I Environmental Site Assessment revealed no recognized environmental conditions; however, several business environmental risks were identified. Floor tile and linoleum tested positive for asbestos, and these materials must be properly removed and disposed of if future renovations or demolition will disturb the materials. Lead-based paint (LBP) was detected in the large bar room and the furnace room. If future renovations will disturb the LBP and cause an exposure risk to future occupants, the LBP must be abated or encapsulated. Visible mold growth and a strong mold odor is present in the building. The condition of the interior of the building is extremely poor. Water damage is present throughout the building, the ceiling is falling apart throughout, and pigeons had nested in the east side of the top floor, resulting in prevalent bird waste. If the building will be renovated, the roof and other sources of water intrusion should be repaired and mold-impacted building materials either cleaned up or removed and replaced. All bird waste should be properly removed wearing appropriate personal protective equipment.
Commercial (.2)


Top of Page