Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
259900
300 N. Holden Street WARRENSBURG, MO 64093
1.2
12-60-24-03-014-0001.00
38.765095988645 / -93.740848039156
4


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Missouri Department of Natural Resources4W97798801MOSection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$3,302.4412/06/202301/09/2024Missouri Department of Natural ResourcesYFY24


Is Cleanup Necessary? Yes
EPA Assessment Funding: $3,302.44
Leveraged Funding:
Total Funding: $3,302.44


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 1.2
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Construction began on this 26,000 sq. ft. courthouse in 1896, with the building occupied by 1898. It has been used as a courthouse and administrative office building since. The building's mechanical, electrical and plumbing systems are outdated, so the county has a construction project planned to update the HVAC and MEP systems. Given the age of the building, the county is concerned about possible ACM and LBP that construction personnel may encounter. A limited Phase II assessment for ACM and LBP surveys is requested. Specifically, the county only needs a determination on the presence of ACM on the interior floors, ceilings, and pipe wrapping on HVAC and plumbing systems. LBP on the both the interior and exterior of the building needs to be ascertained, as the windows will also be replaced. Both friable and non-friable asbestos-containing materials were found within the building. Lead-based paint was found on various structures within the building. The friable regulated ACM must be removed by a licensed Missouri abatement contractor prior to any activities that may disturb it. Any non-friable Category I ACM that's damaged must be removed by a licensed Missouri abatement contractor prior to any activities that may disturb it. As the drywall joint compound contains above 1% asbestos, any disturbance of it is considered Class II asbestos work by OSHA regulations and should be handled accordingly, even though the drywall itself contains less than 1% asbestos. Construction workers must be made aware of the locations of lead-based paint and any disturbance of those structures must be conducted in accordance with applicable federal, state, and local laws.
Commercial (1.2)


Top of Page