Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

NAYA site
260787
7602 - 7633 N. Gloucester Ave PORTLAND, OR 97203
.96
45.582528000503 / -122.722743005828
3
Olson, Margaret
Olson.Margaret@epa.gov
503-326-5874


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
METROBF01J86401ORAssessment2020


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase II Environmental Assessment$34,750.0009/14/202101/21/2022METROYFY24
Supplemental Assessment$22,750.0004/14/202211/04/2022METRON


Is Cleanup Necessary? Yes
EPA Assessment Funding: $57,500.00
Leveraged Funding:
Total Funding: $57,500.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media



Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
03/03/202304/07/2023METRONo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .96
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding:
Leveraged Funding: $627,545.00
Cost Share Funding:
Total Funding: $627,545.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Reduce waste and manage materials sustainablyPractices to reduce water and manage materials sustainably may include minimizing consumption of virgin materials; minimizing waste generation; use of recycled products and local materials; beneficially reusing waste materials (e.g. concrete made with coal combustion products replacing a portion of cement); and segregating and reusing or recycling materials, products, and infrastructure (e.g. soil, construction and demolition debris, buildings).


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
03/03/2023$250,000.00METRO07/25/2024
03/03/2023$21,781,235.00METRO07/25/2024
03/03/2023$800,000.00METRO07/25/2024
03/03/2023$6,753,743.00METRO07/25/2024


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
Incorporate green building techniquesGreen building is the practice of creating healthier, more resource-efficient models of construction, renovation, operation, maintenance, and demolition. Green building techniques can be instrumental in addressing increased frequency and intensity of extreme weather events and natural disasters by more effectively controlling stormwater, reducing waste and energy use, and designing smarter infrastructure that allows for adaptation and mitigation. Techniques may include green roofs; energy, lighting, and water efficiencies; use of sustainable building materials; and incorporation of passive survivability features. Passive survivability is a building's ability to maintain habitability without relying on external utility systems for power, fuel, water, or sewer services, as well as being better able to withstand floods, severe weather, and temperature extremes.
Install green infrastructureGreen infrastructure includes practices and features to reduce the burden of storm events on local water infrastructure. Examples include green roofs, downspout disconnection, urban tree canopies, rainwater harvesting, rain gardens, planter boxes, green parking (permeable pavement), urban agriculture, and community open space.
Incorporate and encourage multi-modal transit opportunities in redevelopment activitiesPlanning, designing and building streets that enable access for all users, including pedestrians, bicyclists, motorists and transit riders. Brownfield redevelopment projects can incorporate sidewalks in their plans to allow for pedestrian traffic, outdoor public spaces to encourage community gatherings, and bicycle parking, bike share rentals, and bike trails to encourage biking throughout the community.
Incorporate renewable energy developmentRenewable energy development may include solar, wind, geothermal and combined heat and power (CHP).


Top of Page


Additional Property Attributes

Previously 34 older units have been reconsructed into 58 new units with more "family-sized" options (2-3 bedrooms)


Top of Page