Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Former Clear Creek Middle School & District Office
Government
261595
320 CO-103 IDAHO SPRINGS, CO 80452
7
183535402907
39.738914447044 / -105.522736247664
2


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Colorado Department of Public Health & Environment4W96873501COSection 128(a) State/Tribal2022


Top of Page


Assessment Activities at this Property

There are no current assessment activities.


Is Cleanup Necessary?
EPA Assessment Funding:
Leveraged Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Mercury
Other Metals
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
07/01/2023$395,505.0003/07/2024Colorado Department of Public Health & EnvironmentYes
07/01/202303/07/2024Colorado Department of Public Health & EnvironmentYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Cleanup of the site structure (Building 103) was completed via abatement of asbestos containing materials and removal of mercury-containing gym flooring.
Address of Data Source:
Total ACRES Cleaned Up: 7
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding: $395,505.00
Leveraged Funding: $3,000,000.00
Cost Share Funding:
Total Funding: $3,395,505.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
Reduce waste and manage materials sustainablyPractices to reduce water and manage materials sustainably may include minimizing consumption of virgin materials; minimizing waste generation; use of recycled products and local materials; beneficially reusing waste materials (e.g. concrete made with coal combustion products replacing a portion of cement); and segregating and reusing or recycling materials, products, and infrastructure (e.g. soil, construction and demolition debris, buildings).


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
03/01/2023$28,700,000.00Colorado Department of Public Health & Environment08/12/2024


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
Incorporate green building techniquesGreen building is the practice of creating healthier, more resource-efficient models of construction, renovation, operation, maintenance, and demolition. Green building techniques can be instrumental in addressing increased frequency and intensity of extreme weather events and natural disasters by more effectively controlling stormwater, reducing waste and energy use, and designing smarter infrastructure that allows for adaptation and mitigation. Techniques may include green roofs; energy, lighting, and water efficiencies; use of sustainable building materials; and incorporation of passive survivability features. Passive survivability is a building's ability to maintain habitability without relying on external utility systems for power, fuel, water, or sewer services, as well as being better able to withstand floods, severe weather, and temperature extremes.


Top of Page


Additional Property Attributes

The property, owned by the school district, formerly operated as a middle school/high school. The site building was constructed in 1969. Assessment identified the presence of asbestos containing building materials, mercury containing gym flooring, and radon. ACM and mercury flooring were abated and radon mitigation pumps were installed. After cleanup the four-story building was renovated and remodeled as an elementary school for the district with space for community entities including an early childhood education center and community arts and education program.
Commercial (7)
ID Number (if Applicable): 22CC3999A Enrolled:
05/07/2024


Top of Page