Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Life Remodeled
Private
262727
9740 McKinney Street DETROIT, MI 48224
5.93
21072609-16
42.413581992692 / -82.946718038501
13
Didier, Matt
Didier.Matthew@epa.gov
312-353-2112


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
County of Wayne4B00E03553MIAssessment2023


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Supplemental Assessment$35,775.0008/08/202409/03/2024County of WayneYFY25


Is Cleanup Necessary? Yes
EPA Assessment Funding: $35,775.00
Leveraged Funding:
Total Funding: $35,775.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 5.93
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

PM Environmental (PM), a Pinchin Company, has completed a Pre-Renovation Asbestos Containing Materials (ACM) and Lead-Containing Paint Survey of the Former Winans Performing Arts Academy located at 9740 McKinney Street, Detroit, Michigan.

The results of PM's survey identified the following ACM:

* Mudded Fitting Associated with Aircell Straight Pipe Insulation (HA1) - 382 Each**
* Aircell Straight Pipe Insulation (HA2) - 2,516 Linear Feet**
* Duct Vibration Joint (HA3) - 40 Square Feet
* Breaching Insulation (HA4) - 10,580 Square Feet**
* Millboard Straight Pipe Insulation (HA8) - 319 Linear Feet
* Mudded Fitting Associated with Millboard Straight Pipe Insulation (HA9) - 56 Each
* Boiler Panel Insulation (HA10) - 350 Square Feet
* Spray On Fireproofing (HA13) - 2,025 Square Feet
* 18" x 18" Green Floor Tile and Mastic (HA14) - 1,498 Square Feet
* 9" x 9" Red Floor Tile and Mastic (HA15) -8,735 Square Feet
* Black Wall Adhesive Associated with Chalkboard (HA17) - 689 Square Feet
* 9" x 9" Brown Floor Tile (HA33) - 3,905 Square Feet
* 9" x 9" Grey Floor Tile (HA35) - 165 Square Feet
* 6" x 24" Brown Floor Tile (HA36) - 25 Square Feet
* Original Brown Cove Base (HA39)- 32 Linear Feet
* Interior Door Frame Caulk (HA44) - 17 Linear Feet
* 9" x 9" Red with Tan Streaks Floor Tile (HA47) - 375 Square Feet
* 6" x 24" Black Floor Tile (HA49) - 55 Square Feet
* 12" x 12" Red with White Specks Floor Tile (HA51) - 115 Square Feet
* TSI Debris (HA56) - 4,600 Square Feet**
* Radiator Heat Shield (HA66) - 90 Square Feet
* 9" x 9" White with Tan Flakes Floor Tile (HA73) - 3,550 Square Feet
* 9" x 9" Black with Tan Flakes Floor Tile (HA74) - 2,744 Square Feet
* 12" x 12" Green Floor Tile and Yellow over Black Mastic* (HA76) - 20 Square Feet
* Tan Door Frame Caulk (HA78) - 96 Linear Feet
* 9" x 9" Blue Floor Tile (HA86) - 250 Square Feet
* Breaching Insulation Debris (HA87) - 3,425 Square Feet
* HVAC Duct Wrap (HA92) - 110 Square Feet
* Exterior Entry Door Frame Caulk (HA100) - 95 Linear Feet
* Exterior Building Caulk (HA101) - 120 Linear Feet
* Exterior Stained-Glass Window Frame Caulk (HA102) - 86 Linear Feet
* Entrance Door Window Glazing (HA104) - 484 Linear Feet
* Wall Penetration Frame Caulk (HA106) - 6 Linear Feet

*Although the floor tile layer and yellow mastic layer of the 12" x 12" Green Floor Tile and Yellow over Black Mastic (HA76), were found to not contain asbestos, PM determined that the floor tile and mastic layers of this material are inseparable. Therefore, the entire material must be treated as ACM.

**This is an estimated quantity of the material due to the limited access in Crawl Space Areas and Auditorium Attic.

These materials will need to be removed by a licensed abatement contractor if impacted by renovation activities. If the materials are in damaged or significantly damaged condition, they will either need to be removed or repaired by a licensed abatement contractor.

The following materials were identified by PM but were not sampled in order to avoid excessive damage. These materials are therefore considered assumed ACM:

* Tagged Metal Fire Door (Assumed ACM) (HA45) - 1 Each
* Tagged Fire Frame (Assumed ACM) (HA46) - 45 Each
* Tagged Red Metal Fire Door (Assumed ACM) (HA48) - 2 Each
* Tagged Metal Fire Door with Seam (Assumed ACM) (HA50) - 4 Each
* Tagged Wood Fire Door (Assumed ACM) (HA53) - 57 Each
* Tagged Metal Fire Door (Assumed ACM) (HA60) - 1 Each
* Tagged Metal Fire Door with Panels (Assumed ACM) (HA83) - 16 Each
* Tagged Metal Safe Fire Door (Assumed ACM) (HA98) - 1 Each

If feasible, PM recommends sampling these materials before renovation activities to determine asbestos content. Otherwise, these materials will need to be removed by a licensed abatement contractor if impacted by renovation activities. If the materials are in damaged or significantly damaged condition, they will either need to be removed or repaired by a licensed abateme