30481
326 Monse Bridge Road Brewster, WA 98813
1
3125340065
48.138269 / -119.66934800000001
4
Labaw, Joanne
Labaw.Joanne@epa.gov
206-553-2594


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Colville Confederated TribesRP96043901WASection 128(a) State/Tribal2006
Colville Confederated TribesRP97062301WASection 128(a) State/Tribal2005
Confederated Tribes of the Colville ReservationRP96082703WASection 128(a) State/Tribal2010


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$13,230.0007/01/200710/26/2007Colville Confederated TribesN
Phase I Environmental Assessment$6,678.0009/15/200509/15/2005Colville Confederated TribesYFY06
Phase II Environmental Assessment$67,000.0009/30/200609/30/2006Colville Confederated TribesN


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $86,908.00
Leveraged Funding:
Total Funding: $86,908.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Lead
Other Contaminants
Other Metals
Petroleum Products
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 1
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Earl Crofoot Property comprises of 1.1 acres in far western Okanogan County. The property lies at an elevation of approximately 800-feet above sea-level; the nearby Okanogan River lays approximately 770-feet above sea-level. The property slopes two percent toward the west and is located approximately 950-feet east of the Okanogan River, which flows to the south. North of the property is the Monse Bridge Road and private property used for agricultural purposes. South of the property is the McCraigie family residence. West of the property is the property owned by Mrs. Wilmetta Crofoot, Earl Crofoot�s mother. East of the property is Highway 97 and Colville Tribal trust land, which is used for agricultural purposes. (PPF- Earl Crofoot Property. 9/18/2006)

Former Use: Mr. Crofoot began treating wood posts and poles with a PCP-diesel mixture in 1982 after purchasing the materials and equipment from a Colville Tribal post and pole treatment facility that was previously located in the Nespelem Agency Headquarters area and that had ceased operations. Treatment of posts and poles involved dipping them into a 4-by-4-by-9 foot steel dip tank or a 2-by-2-by-17 foot steel dip tank. The PCP-diesel mixture consisted of 48% PCP and 52% diesel oil. After dipping, the poles were propped against a shed or nearby equipment, or stacked on a rack above the tanks to drip dry. The treated poles were then stored on the property either north of the 3,000-gallon AST or between two vertical poles south of the AST. The PCP-diesel mixture was stored in a 3,000-gallon as well as a 500-gallon AST and also a 4-by-4-by-6 foot apple washing tank. Approximately 18,000 gallons of the PCP-diesel mixture were used during operations. Treatment operations continued for three years until 1985.