Profile Information

Government
70011
145-155 Beech Street Chelsea, MA 02150
1.81
42.399312 / -71.039197
7
Paar, Dorothy
Paar.Dorrie@epa.gov
617-918-1432


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Chelsea, City ofBF97181801MACleanup2007


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Supplemental Assessment01/01/201412/31/2015Chelsea, City ofN
Supplemental Assessment01/01/201412/31/2015Chelsea, City ofN
Supplemental Assessment01/01/201412/31/2015Chelsea, City ofN
Supplemental Assessment01/16/201205/08/2012Chelsea, City ofN


Is Cleanup Necessary? Yes
EPA Assessment Funding:
Leveraged Funding: $745,430.00
Total Funding: $745,430.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


PCBS
Cleaned Up
Soil
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
06/11/201306/16/2017Chelsea, City ofYes
06/11/201306/16/2017Chelsea, City ofYes
06/11/201306/16/2017Chelsea, City ofYes
06/11/201306/16/2017Chelsea, City ofYes
06/11/2013$200,000.0006/16/2017Chelsea, City ofYes
06/11/201306/16/2017Chelsea, City ofYes
06/11/201306/16/2017Chelsea, City ofYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 1.81
Number of Cleanup Jobs Leveraged: 350
EPA Cleanup Funding: $200,000.00
Leveraged Funding: $11,564,489.00
Cost Share Funding: $40,000.00
Total Funding: $11,804,489.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
Activity and Use Limitation (AUL)
https://eeaonline.eea.state.ma.us/portal#!/wastesite/3-0017917
Yes
06/12/0017
Yes
Cover Technologies (e.g., Capping)
Yes
06/06/2017


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
01/01/2015$4,800,000.00Chelsea, City of03/15/2017
01/01/2015$2,000,000.00Chelsea, City of03/15/2017
01/01/2015$30,647,500.00Chelsea, City of03/15/2017


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The project site was originally occupied by the American Barrel Company from 1938 to 1974. In May 1974, just a few days before the business was scheduled to vacate the property upon orders from local officials, a fire sparked within the on-site building, creating a massive conflagration that leveled several City blocks. The surrounding area was at the time used by a number of manufacturing facilities that were active from the late 1800s into the 20th century. All of the businesses were destroyed by the 1974 fire. Local crews removed the huge debris piles, and backfilled the area using materials that were available. The site was abandoned for over 5 years. In June 1979, the site was redeveloped by the Superior Distributing Company (Superior). Superior constructed a large rectangular building on slab foundation, in the southern portion of the site. Superior utilized the building as warehouse, until 1986, when the site was purchased by the Lawrence Metals Forming Corporation (LMFC). The LMFC operations included manufacturing and custom fabrication of various metal products. In 1999, the Chelsea Economic Development Board (CEDB) purchased the property and several surrounding parcels, as part of the Master Plan for the Everett Avenue Urban Renewal District, an economic development plan for a 5-acre section of the City. In 2000, the on-site building was demolished, and subsurface investigations revealed the presence of substantial concentrations of polychlorinated biphenyls (PCBs) in subsurface soils. The predicted costs to remediate the soils exceeded any feasible development options; further, the location of the Chelsea High School just 100 feet from the site created a potential Imminent Hazard to human health, and the property was fenced off and left abandoned. For over 13 years, the extent of the environmental impacts to the site were studied and quantified, but any opportunity to redevelop the site was deemed too costly. The site was left idle for over 12 years, while all of the surrounding properties were acquired and redeveloped in accordance with the Master Plan. On 6 June 2012, at the request of the City of Chelsea (the City), a meeting was held to discuss site conditions and their possible impact to the surrounding area, including Chelsea High School. The meeting was attended by representatives from the City, Massachusetts Department of Environmental Protection (MassDEP), and United States Environmental Protection Agency (EPA). All entities were concerned about the ongoing environmental risks posed by high levels of PCBs and lead present in the soils. The City also stated that it lacked the necessary funds to address the conditions at the site. In 2013, XSS Hotels through their project entity, Lawrenceville LLC (the Developer), and the EPA, MassDEP, the City, and the CEDB, agreed to a plan for the EPA to complete a risk-based cleanup of the site, which would remediate PCB-impacted materials and allow the City to an acquisition/development agreement with the Developer. The remediation plan focused on reducing the highest concentrations of PCBs at the property as the dominant contaminant requiring cleanup. The feasible, revenue producing future use was to construct an extended stay hotel. The assistance from the EPA brought the City the technical and financial resources to attract the potential developer, Lawrenceville LLC as well as the confidence in the end point of the cleanup goals. In 2014-2015 the Developer took on financial responsibility for further remediation to reduce risks at the site and complete the redevelopment. In March 2017, the Chelsea Hilton Homewood Suites opened for business. Former Use: The site had been occupied by the American Barrel Company (American Barrel) from the late 1930s through 1974 when American Barrel?s facility was destroyed by an extensive fire which originated on-site and spread to adjoining properties. Documented historical operations and land use practices by the American Barrel inclu
Industry (1.81)
Hazardous
ID Number (if Applicable): 3-0017917 Enrolled: 01/25/1999
06/16/2017
06/16/2017