176062
123 Capote Drive Ignacio, CO 81137
.5
37.1292 / -107.6359
3
Rothenmeyer, William
Rothenmeyer.William@epa.gov
303-312-6045


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R8 TBA - Colorado (STAG Funded)n/aCOTBA2004
Southern Ute Indian TribeBG97872922COSection 128(a) State/Tribal2021
Southern Ute Indian Tribe4W96895101COSection 128(a) State/Tribal2022
Southern Ute Indian TribeBG97872917COSection 128(a) State/Tribal2016


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$4,976.5003/15/202107/16/2021Southern Ute Indian TribeNFY22
Cleanup Planning$2,352.9401/04/202101/29/2021Southern Ute Indian TribeYFY22


Is Cleanup Necessary? Yes
EPA Assessment Funding: $7,329.44
Leveraged Funding:
Total Funding: $7,329.44


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Asbestos
Lead
Other Contaminants
PCBS
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Sediments
Soil
Cleaned Up
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
05/22/2024$185,038.0010/30/2024Southern Ute Indian TribeYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .5
Number of Cleanup Jobs Leveraged: 3
EPA Cleanup Funding: $185,038.00
Leveraged Funding:
Cost Share Funding:
Total Funding: $185,038.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate demolition or cleanup activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Institutional and Engineering Controls

U
Yes
03/15/2021
Yes
Cover Technologies (e.g., Capping) Immobilization Process (e.g., Encapsulation, In-Situ Solidification) Engineered Barriers (e.g., Slurry Walls, Sheet) Security (e.g., Guard, Fences)
Institutional controls for the asbestos in the crawlspace and indoor air monitoring work was completed in March 2021.
Finalized Operations and Maintenance Plan for implementation in March 2022.
Engineering control for soil on west side of building in 2024. Contaminated soil was covered.
Yes
10/10/2024


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site is a 1-story brick bldg constructed in the 1930s with an addition in mid-1990s. Contaminants include ACM, LBP, and mercury switch. Contaminants cleaned up in 2024. Re-use unknown
Commercial (.5)
12/03/2024