Government
177044
I-490 and 55th Street to the Cleveland Clinic Cleveland, OH 44195
23.2
Multiple (BL I - 82; BL 2C- 53)
41.5034433 / -81.62059529999999
11


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
R5 TBA - Ohio (STAG Funded)n/aOHTBA2004


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$33,935.0001/20/201606/10/2016R5 TBA - Ohio (STAG Funded)NFY16
Phase I Environmental Assessment$40,000.0007/31/201402/27/2015R5 TBA - Ohio (STAG Funded)YFY16
Phase II Environmental Assessment$58,000.0007/08/201503/15/2016R5 TBA - Ohio (STAG Funded)N


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $131,935.00
Leveraged Funding:
Total Funding: $131,935.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Lead
PAHS
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 23.2
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The US EPA tasked Tetra Tech to conduct a Phase I and II ESAs of the site under the Superfund Technical Assessment and Response Team (START) contract EP-S5-13-01, Technical Direction Document (TDD) No. S05-0003-1407-020. A roadway project is planned stretching approximately three miles and linking nine development districts. A hybrid Phase I Environmental Assessment was completed for Block 1 to assess multiple residential, industrial and commercial properties for potential highway extensions and potential commercial redevelopment. The properties evaluated in the Phase I ESA are part of the "Project Corridor" located along Grand Avenue, Rawlings Avenue, and Holton Avenue approximately 1.4 miles east of the intersection of Interstate 490 and 77 and consisting of 82 parcels. Properties were assessed low, medium or high priority status based on potential for impacts due to former operations. A Phase II ESA was performed for Block 1 or potential acquisition and future redevelopment by the neighboring business Orlando Baking. The Phase II ESA was completed in Fall and Winter of 2015 for Block I. A Phase I ESA for Block 2C was performed following the procedures listed above. Block 2C consists of properties bounded by Holton, East 79th Street, RTA Railroad tracks and East 75th Street.

Former Use: A roadway project is planned stretching approximately three miles and linking nine development districts. A hybrid Phase I Environmental Assessment was completed to assess multiple residential, industrial and commercial properties for potential highway extensions and potential commercial redevelopment. The properties evaluated in the Phase I ESA are part of the "Project Corridor" located along Grand Avenue, Rawlings Avenue, and Holton Avenue approximately 1.4 miles east of the intersection of Interstate 490 and 77 and consisting of 82 parcels. Properties were assessed low, medium or high priority status based on potential for impacts due to former operations. A Phase II ESA was performed for Block 1 parcels in Fall and Winter of 2015 to assess potential for redevelopment by the neighboring business Orlando Baking. A Phase I ESA was performed for Block 2C properties in Spring 2016 for properties bordered by Holton, East 79th Street, RTA railroad tracks, and East 75th Street.
Commercial (4.13) Industry (9.5) Residential (.87)
Hazardous


Top of Page