Profile Information

Private
250896
251 Main Street LEWISTON, ME 04240
.79
Map 207, Lot 41 & Map 195, Lot 20
44.0999820195604 / -70.21555100112015
2
Peterson, Alan
Peterson.Alan@epa.gov
617-918-1022


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Androscoggin Valley Council of GovernmentsBF00A00665MEAssessment2020


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$5,850.0010/13/202111/17/2021Androscoggin Valley Council of GovernmentsYFY22
Supplemental Assessment$3,713.9411/29/202112/28/2021Androscoggin Valley Council of GovernmentsN


Is Cleanup Necessary? No
EPA Assessment Funding: $9,563.94
Leveraged Funding:
Total Funding: $9,563.94


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media



Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .79
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site consists of two contiguous parcels of land, encompassing a total of approximately 0.79 acres. The northern Site parcel (251-253 Main Street) has been developed as Saint Joseph's Church since 1867. This parcel currently includes the Church and Boiler House buildings, and formerly included the Rectory building, which was demolished in 2013. The southern Site parcel (21 Blake Street) was previously occupied by a multi-family residential building, which was also demolished in 2013. The Site parcels are currently owned by Central Maine Healthcare Corporation and are not currently occupied.

Saint Joseph's Church ceased operation at the Site in 2009. The Saint Joseph's Church parcel and adjacent 21 Blake Street parcel were purchased by Central Maine Healthcare Corporation in 2013. The residential building at 21 Blake Street and the former Rectory building were demolished shortly after the properties were purchased by Central Maine Healthcare Corporation. Prior to demolition activities, McCarthy Environmental Services completed asbestos surveys for both the 21 Blake Street buildings and the Saint Joseph's Church buildings. Asbestos-containing materials associated with the 21 Blake Street buildings and the former Rectory building were presumably abated prior to demolition of those buildings. Asbestos containing materials identified in connection with the Boiler House building, which are expected to remain at the Site, include boiler insulation, pipe insulation, and the boiler room roof. Asbestos-containing sheetrock/joint compound identified in the basement hallway, boiler room, and bathrooms of the Church building has reportedly and apparently been abated.
Commercial (.79)