Profile Information

AI#174875
Government
253157
242 West Shamrock Street PINEVILLE, LA 71360
600
2401767005000101
31.327303983889195 / -92.44090496210424
5
Scott, Camisha
Scott.Camisha@epa.gov
214-665-6755


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Louisiana Department of Environmental QualityBF01F96101LAAssessment2021
Louisiana Department of Environmental Quality4B02F16301LAAssessment2022


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$6,082.0008/30/202201/18/2023Louisiana Department of Environmental QualityYFY23
Phase II Environmental Assessment$143,852.0809/18/202307/16/2024Louisiana Department of Environmental Quality
Phase II Environmental Assessment$6,947.0903/28/202309/15/2023Louisiana Department of Environmental Quality


Is Cleanup Necessary? Yes
EPA Assessment Funding: $156,881.17
Leveraged Funding:
Total Funding: $156,881.17


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
PAHS
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Building Materials
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 600
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Central Louisiana State Hospital site is an approximately 600-acre partially wooded area developed with a Psychiatric Hospital and associated buildings and paved parking areas owned by the Louisiana Department of Health (LDH). The buildings are partially vacant, and the initial PI assessment is being conducted on the approximately 400-acre vacant area, with plans to assess the remaining 200 acres in the future. The Central Louisiana State Hospital was created as an "insane asylum" by an act of the Louisiana Legislature in 1902 and began admitting patients on January 6, 1906. It was intended to be a self-sustaining farming community complete with medical facilities, morgue, cemetery, farm animals, dairy barn, etc. The original plan was to treat 400 patients, but by the 1950's, the number of patients had grown to over 3,000. During the 1960's, rehabilitation programs began to be developed and through the years many new programs have been introduced. LDH is in the process of moving their operations to a new off-site facility which will leave approximately 400 acres of the site vacant. Based on past uses and the age of the buildings, we anticipate that the buildings may contain lead and asbestos materials and the site may contain USTs from heating oil, emergency generators and a former fueling station. A former auto shop and a former paint shop are also listed on site maps provided.

A Phase I was completed in January 2023 on portions of the Property (Priority Site A), which identified several RECs associated with historical uses of the site. Due to the size of the site, LDEQ is working with stakeholders on a plan to further assess the environmental conditions at the site in targeted areas based on identified RECs. The majority of Priority Site A underwent Phase II ESA sampling including soil and groundwater sampling, UST removals to sample underneath the tanks, and asbestos and lead based paint inspections. PAHs were identified above regulatory standards at Unit 26-UST #6, and this area requires further delineation to determine the extent of the impact. The Soil and Groundwater Sampling and UST Closure report can be viewed here: https://edms.deq.louisiana.gov/app/doc/view?doc14422204. ACM and LBP were identified within building materials at structures throughout the site. ACM and LBP Inspection reports can be viewed at dms.deq.louisiana.gov under AI#174875. The City is currently working with LDEQ and Rapides Area Planning Commission who was awarded a Brownfields Assessment Grant in 2024, to continue assessment work at the site.

LDEQ is currently working with EPA Region 6 - Regionally Directed Land Revitalization Program to develop a reuse plan for the site. LDH plans to transfer ownership of the property to the City of Pineville for redevelopment once all operations of the 600-acre area are moved to the new facility.
Commercial (90) Greenspace (300) Residential (10)


Top of Page