255553
919 5th Street SIOUX CITY, IA 51101
.76
894728404007, 894728404006, and 894728404005
42.49556299880871 / -96.39833697881473
4
Foley, Charlie
foley.charlie@epa.gov
9135517710


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Sioux City, City ofBF97787201IAAssessment2021


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$2,450.0004/08/202205/31/2022Sioux City, City ofYFY24
Phase I Environmental Assessment$850.0002/08/202303/28/2023Sioux City, City ofNFY24
Phase I Environmental Assessment$500.0002/28/202304/10/2023Sioux City, City ofNFY24
Phase II Environmental Assessment$3,300.0002/21/202303/29/2023Sioux City, City ofN
Supplemental Assessment12/20/202212/21/2022Sioux City, City ofN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $7,100.00
Leveraged Funding: $925.00
Total Funding: $8,025.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Petroleum Products
Arsenic
Asbestos
Other Metals
VOCs
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Petroleum Products
Building Materials
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .76
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
01/03/2023$450,000.00Sioux City, City of01/04/2023


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Available historical documents list the property as a battery shop in 1974, 1979, 1984, 1989, 1992, 1995, 2000, 2005, 2010, 2014, and 2017. The structure is currently used for storage.

The City conducted the three Phase I ESAs highlighted in this work package on both 901 and 919 5th Street as one report as they had the same ownership and were acquired by the same entity; however, the City is entering each property into ACRES as separate work packages due to their differing cleanup approaches. The amount of funding expended for the Phase I ESAs will be split evenly between the two properties. The corresponding Phase II ESAs were conducted separately.

The City completed GPR activities, outside of this cooperative agreement, to investigate the potential presence of USTs prior to completing any soil borings. The GPR study did not identify any anomalies indicative of a UST. The Phase II investigation identified arsenic in soil above the SWS but within the previous SWS and within the background range identified for the larger Sioux City area. Four (4) VOCs were reported in vapor samples above EPA Regional Screening Levels (RSLs) for residential indoor air while two also exceeded EPA RSLs for industrial indoor air. The soil and vapor results identified acceptable cancer and non-cancer risks for residential and non-residential site users when considering an arsenic in soil background concentration of 9.6 mg/kg. An asbestos survey identified one sample with ACM content greater than 1% (window glazing).

Note: the City completed an Update to the original Phase I ESA with an anticipated closing date of March 31, 2023. The closing date got moved and the City could not extend the Update viability date out any further so it required the completion of a 2nd Phase I ESA. Both properties were acquired in the same purchase, so the amount is split evenly between the two work packages.