Profile Information

Stratton Elementary School Site
Private
197041
425 Colorado Avenue STRATTON, CO 80836
2.63
00000077015007
39.3021237 / -102.6050481
4
Wilson, Christina
Wilson.Christina@epa.gov
303-312-6706


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Colorado Department of Public Health & Environment4W96873501COSection 128(a) State/Tribal2022
Colorado Department of Public Health and EnvironmentRP98898903COSection 128(a) State/Tribal2013


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$10,000.0010/08/202311/10/2023Colorado Department of Public Health & Environment
Phase I Environmental Assessment$3,000.0006/25/201510/30/2015Colorado Department of Public Health and EnvironmentYFY16
Phase II Environmental Assessment$3,200.0005/10/201606/03/2016Colorado Department of Public Health and EnvironmentN
Phase II Environmental Assessment$12,200.0010/21/201511/04/2015Colorado Department of Public Health and EnvironmentN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $28,400.00
Leveraged Funding:
Total Funding: $28,400.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Cleaned Up
Building Materials
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
07/13/201707/16/2018Colorado Department of Public Health & EnvironmentYes


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Abatement of asbestos containing building materials and clearance monitoring and sampling was completed at the site prior to building demolition in July 2017. Visual clearance of the post demolition area for non-friable ACM that remained in place during the demolition was completed in July 2018.
Address of Data Source:
Total ACRES Cleaned Up: 2.63
Number of Cleanup Jobs Leveraged: 0
EPA Cleanup Funding:
Leveraged Funding: $80,626.00
Cost Share Funding:
Total Funding: $80,626.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site, identified as the Blighted Elementary School, is located in a mixed residential and commercial setting. A Phase I ESA, structural assessment, and regulated building materials survey of the original 1.6 acre site was conducted by CDPHE in 2015. The property operated as an elementary school from the late 1930s until 1979 when the property was sold and converted to a pizzeria and bowling alley. Commercial use continued until 2007 when the property was sold and used for storage until 2012 when the property was vacated and remained so through 2015 when The Stratton Area Foundation (SAF) purchased the property. The Phase I ESA did not identify any RECs in connection with the Site. However, the Phase II ESA (i.e., Asbestos and Lead-Based Paint Survey) identified asbestos containing building materials throughout the 11,000 square former school building. The structural assessment of the dilapidated building confirmed that asbestos abatement could be completed safely prior to demolition. that will need to either be properly abated prior to demolishing the building, or, because it may not be possible to properly abate due to unsafe building conditions, the entire building should be demolished as asbestos-containing.

In 2017, SAF received a state brownfields cleanup grant from CDPHE and completed asbestos abatement of the former school building. SAF then completed demolition of the former school structures, backfill, and leveling in 2018. Between 2018 and 2022, SAF acquired the parcels adjacent to the original site, expanding the Site to encompass a total of approximately 3.44 acres. In 2023, CDPHE completed a Phase I ESA of the 3.44-acre Site for the Stratton Area Foundation 2 (SAF2), a sister organization of SAF, who now owns the Site. The expanded Site included a former single-stall car wash demolished in 2023 and a portion of the Site that was used for equipment sales. The 2023 Phase I ESA identified a former diesel dispensing station on the east adjacent property that poses a vapor encroachment condition (VEC) and REC to the Site. The Phase I ESA recommended incorporating vapor mitigation systems in new construction to address potential petroleum vapor intrusion. All buildings on the Site have been demolished and redevelopment plans include construction of a daycare center.
Commercial (2.63)
Enrolled: 06/12/2015
07/16/2018