Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
242261
11531 Wildcat Drive POUND, VA 24279
27.44
R021289
37.1294026 / -82.5993666
9
Anderman, Craig
Anderman.Craig@epa.gov
NOT_FOUND


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
LENOWISCO Planning District CommissionBF96371101VAAssessment2019


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$4,000.0011/03/202004/01/2021LENOWISCO Planning District Commission
Phase I Environmental Assessment$3,000.0002/13/202003/13/2020LENOWISCO Planning District CommissionYFY20
Supplemental Assessment$22,100.0006/18/202009/18/2020LENOWISCO Planning District CommissionN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $29,100.00
Leveraged Funding:
Total Funding: $29,100.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: The projected total cost for cleanup ranges from $219,140 to $228,140.
Address of Data Source:
Total ACRES Cleaned Up: 27.44
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
No
U
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
03/01/2022$250,000.00LENOWISCO Planning District Commission06/01/2022
03/01/2022$250,000.00LENOWISCO Planning District Commission06/01/2022


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: Standard and other historical records document a structure (likely a dwelling) located in the southeastern portion were constructed prior to 1914. The structure was demolished between 1914 and 1952. Building 1 was constructed in the southern portion of the property in 1953. Between 1953 and 1963 a recreational field was developed in the northern portion of the property. Between 1963 and 1975, the current dwelling located in the southeastern portion and the current field house located in the west-central portion of the property were constructed. An additional structure, a demountable classroom referred to as ?The Annex?, was constructed in the southwestern portion of the property. Between 1975 and 1977, the football announcer booth was constructed along the eastern portion of the football field. Additionally, a small structure, likely exterior storage, was constructed north of the Annex, where landscaping and maintenance supplies were likely stored. Between 1977 and 1983 the current tennis courts were constructed in the northeastern portion of the property. The property remained consistent until between 1983 and 1991 when the baseball field and the baseball announcer booth, was constructed in the northwestern portion of the property. Between 1983 and 2000 the team pavilion and outhouse were constructed in the west-central portion of the property. Additionally, the concession stand was constructed in the east-central portion of the property. Between 2000 and 2005 the maintenance shed was constructed south of the football field, in the central portion of the property. Additionally, The Annex was demolished and converted into a larger parking lot. Between 2005 and 2009 the current softball field was constructed in the northeastern portion of the property. Educational activities ceased in 2014 and the recreational fields are occasionally used by local athletic teams.
Commercial (27.44)
Hazardous


Top of Page