Peoples Bank of Pound, Former Bank Building
Government
249374
8441 Main Street POUND, VA 24279
.3
017589; 017590; 017587
37.123844999412 / -82.60163902426216
9
Anderman, Craig
Anderman.Craig@epa.gov
NOT_FOUND


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
LENOWISCO Planning District CommissionBF96371101VAAssessment2019
Virginia Polytechnic Institute and State UniversityBF96362701VAAssessment2018


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$4,600.0007/03/202308/07/2023LENOWISCO Planning District Commission
Phase I Environmental Assessment$3,500.0011/18/202001/14/2021Virginia Polytechnic Institute and State UniversityYFY21
Supplemental Assessment$11,600.0008/03/202308/25/2023LENOWISCO Planning District Commission
Supplemental Assessment$12,250.0011/18/202004/29/2021Virginia Polytechnic Institute and State UniversityN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $31,950.00
Leveraged Funding:
Total Funding: $31,950.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Asbestos
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .3
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate demolition or cleanup activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

Start DateLeveraged FundingCACompletion Date
06/01/2021$125,000.00LENOWISCO Planning District Commission
06/01/2021$52,000.00LENOWISCO Planning District Commission


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate redevelopment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Additional Property Attributes

The subject property contains three 250-gallon fuel oil underground storage tanks (USTs) that were previously identified north of the building. Due to unstable slopes and the area north of the building being covered in kudzu vegetation, observations were limited and PM was unable to observe the UST covers. None of the people interviewed were aware of any USTs being removed. The potential exists for orphan USTs to be present on the property and/or for a release to have occurred from the systems.

The following BERs were identified during completion of this Phase I ESA:
* Based on the construction of the building in 1947, there is the potential for existing paint to be lead based or contain lead. It is PM's understanding that the building is planned for demolition.

* Based on a previous Asbestos Containing Materials Survey, asbestos containing materials were previously identified onsite. It is PM's understanding that the building is planned for demolition.

Based on the analytical results of the Asbestos Containing Materials (ACM) Survey, the following ACMs were identified:

- 9" x 9" Tan Floor Tile and Mastic located in the first floor lobby - 300 square feet
- 9" x 9" Brown Floor Tile and Mastic located in the first floor lobby - 10 square feet
- 9" x 9" Green Floor Tile and Mastic located in the first floor vault - 120 square feet
- Roof Flashing with Silver Paint located between roof and short wall around roof - 810
square feet
- Roof Tar between terra-cotta roof tile joints - 60 linear feet
Commercial (.3)
Hazardous


Top of Page