1308 Harper Avenue NW LENOIR, NC 28645
.23
35.909884993876275 / -81.54766901468284
5
Gross, Brian
Gross.Brian@epa.gov
404-562-8604


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
City of LenoirBF00D72218NCAssessment2018


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Supplemental Assessment$12,388.8607/01/202012/31/2020City of LenoirYFY22


Is Cleanup Necessary? Yes
EPA Assessment Funding: $12,388.86
Leveraged Funding:
Total Funding: $12,388.86


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Petroleum Products
Cleaned Up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Minor soil staining was observed within the excavation footprint for UST-1. One soil sample indicated a concentration of TPH-DRO at above NCDEQ action level, while another soil sample from the site did not indicate TPH-DRO above action level. The heat oil UST was a non-regulation, non-commercial tank based on the capacity being less than 1000 gallons. No further action is needed unless specifically directed by NCDEQ based upon risk. Environmental consultant indicated that the site is considered low risk and no further action is recommended.
Address of Data Source:
Total ACRES Cleaned Up: .23
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

The Site is identified as the Former Gibbons Electric and
consists of two parcels totaling 0.23 acres. The property was purchased with intentions of
completing a rehabilitation and expansion to accommodate a Latino non-profit organization and
provide for additional local businesses as tenants. One UST was identified during the purchase
of the property which was properly abandoned and closed-in-place. Two additional USTs, both
likely used for heating oil, were identified during renovation activities. The discovery of the USTs
put the revitalization project in jeopardy due to the unanticipated financial cost of addressing
these tanks.
Commercial (.23)
Petroleum