Cleanup Activities
There are no current cleanup activities.
Cleanup/Treatment Implemented:
N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
On December 5, 6, 7, and 12, 2022, PM advanced ten soil borings (SB-1 through SB-10), installed nine temporary monitoring wells (TMW-1 through TMW-8 and TMW-10), and collected soil and groundwater samples for laboratory analysis of VOCs, PAHs, PCBs, and metals.
No VOC, PAH, PCB, or metal target analytes were detected in the soil samples analyzed at concentrations above the RSLs for Industrial Soil. No concentrations of VOC, PAH, PCB, or metal target analytes were detected in the groundwater samples analyzed from the subject property at concentrations above the EPA MCLs.
The off-site REC associated with the subject property identified in PM's December 2021 Phase I ESA has been adequately assessed along the eastern property boundary. Based on the expected continued use of the property for commercial purposes, no further investigation is warranted.
The RECs associated with the subject property identified in PM's December 2021 Phase I ESA have been adequately assessed. Based on the expected continued use of the property for commercial purposes, no further investigation is warranted.
Address of Data Source:
Total ACRES Cleaned Up: .69
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding: