Profile Information

253415
702 N Albion Street and 612 Washington Park ALBION, MI 49224
.58
42.251320039970494 / -84.76214992104198
5
Gruza, Sarah
Gruza.Sarah@epa.gov
312-886-6004


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Southcentral Michigan Planning CouncilBF00E03046MIAssessment2021


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,000.0008/14/202408/30/2024Southcentral Michigan Planning CouncilFY23
Phase I Environmental Assessment$3,400.0006/27/202208/24/2022Southcentral Michigan Planning CouncilYFY23
Phase II Environmental Assessment$30,737.1411/07/202210/15/2024Southcentral Michigan Planning Council


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $37,137.14
Leveraged Funding:
Total Funding: $37,137.14


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Mercury
Other Metals
NOT Cleaned up
NOT Cleaned up
NOT Cleaned up
Soil
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .58
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

A Phase I Environmental Site Assessment (ESA) was completed of 702 North Albion (Parcel A) Street and 612 Washington Park (Parcel B) in Albion, Calhoun County, Michigan.
At the time of the reconnaissance, the Subject Property consisted of two vacant parcels of land identified as 702 North Albion Street (Parcel A) and 612 Washington Park (Parcel B). Parcel was approximately 0.23 acres in size, and Parcel B was approximately 0.35 acres in size. The area north of the Subject Property consisted of a church and residential developments, and the areas to the east, south, and west were vacant land.
A residence was constructed on Parcel B by 1913, and a garage was constructed on this parcel by 1918. The residence utilized oil heat from at least the date of construction through the 1980s. Parcel B remained residential until the late 2010s, when the residence and garage were demolished. A commercial/store building was constructed on Parcel A by 1918, and a garage was added to this parcel by 1931. The first floor of the commercial/store building was occupied by restaurants and later Flint Eagle Motorcycle and the second floor was used for residential purposes. The buildings on Parcel A were demolished by 2020. The Subject Property was vacant grass- and tree/shrub-covered land at the time of our 2022 reconnaissance.
The following RECs were identified in the Phase I ESA:
* The potential for unknown or unreported releases of hazardous substances and/or petroleum products and potential for a heating oil underground storage tank (UST) to be present on Parcel B of the Subject Property.
* The potential that foundry sand generated by the operations on the Harvard Industries/Hayes Albion site was placed on the Subject Property.
* The potential that known impact has migrated onto the Subject Property from the adjoining Harvard Industries/Hayes Albion site.
* The potential for migration of known impact and potentially unreported and/or undetected releases of hazardous substances and/or petroleum products associated with historical filling stations and automotive repair/service garage operations on sites located north and northeast of the Subject Property.

A Phase II ESA was completed and arsenic and mercury were measured in soil samples at concentrations above Part 201 generic residential cleanup criteria. The potential developer is considering the results as it pertains to their potential redevelopment; additional assessment may be warranted when a direction is decided on how to develop the site.

October 2023 Update - waiting on direction from church on whether they will proceed with potential acquisition of the site.
July 2024 Update - Calhoun County Lank Bank met with church to provide update and request a decision be made on whether they will acquire the site.

To facilitate completion of a Baseline Environmental Assessment (BEA), a new Phase I ESA was completed in August 2024. BEA completed in November 2024.


Top of Page