Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
254179
41675 West Morgan Avenue PENNINGTON GAP, VA 24277
.2
23E-(8)-111,112
36.7582519896134 / -83.02847000911295
9
Anderman, Craig
Anderman.Craig@epa.gov
NOT_FOUND


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
LENOWISCO Planning District CommissionBF96371101VAAssessment2019


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,600.0009/25/202310/23/2023LENOWISCO Planning District CommissionFY23
Phase I Environmental Assessment$3,200.0009/01/202211/18/2022LENOWISCO Planning District CommissionYFY23
Supplemental Assessment$9,098.7509/29/202310/16/2023LENOWISCO Planning District Commission


Is Cleanup Necessary? Yes
EPA Assessment Funding: $15,898.75
Leveraged Funding:
Total Funding: $15,898.75


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate planning or assessment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Contaminants and Media


Asbestos
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented: N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: .2
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate demolition or cleanup activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Institutional and Engineering Controls

U
U


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

Selected Strategy(ies)Explanatory Text
N/AThis property does not incorporate redevelopment activities to address impacts from extreme weather events and natural disasters. If no activities were incorporated, select this option.


Top of Page


Additional Property Attributes

Standard and other historical sources were able to document that the subject property was developed with a portion of a dwelling prior to 1916. The dwelling remained until between 1945 and 1946 when it was demolished, and the property redeveloped with the current building. The building was previously occupied by a pool room, a tire and auto parts store, bakery, library, storage, and sewing operation. The building has been unoccupied since approximately 2016.

PM was informed that the tire and auto parts store was a retail store and did not perform maintenance operations or tire retreading operations. Based on the lack of maintenance operations and lack of regulatory listings, PM has not identified the previous tire and auto parts store operations as a REC.

The following de minimis condition was identified during completion of this Phase I ESA:

* PM observed coal ash around the base of the former coal-fueled boiler in the building basement. Due to the accumulated material, PM was unable to observe the concrete base immediately underneath the coal ash. However, the observed pavement surrounding the boiler was in good condition. Therefore, PM has identified the accumulated coal ash as de minimis.

The following significant Non-ASTM Scope Considerations and/or BERs were identified during completion of this Phase I ESA:

* Damaged suspect asbestos containing floor tiles were observed throughout the ground floor.

* Evidence of water intrusion was identified in various areas which could contribute to mold growth as the air is not conditioned. Additionally, possible roof leaks may also be present based on observed ceiling damage.

2023 Phase I Update:

Standard and other historical sources were able to document that the subject property was developed with a portion of a dwelling prior to 1916. The dwelling remained until between 1945 and 1946 when it was demolished, and the property redeveloped with the current building. The building was previously occupied by a pool room, a tire and auto parts store, bakery, library, storage, and sewing operation. The building has been unoccupied since approximately 2016.

PM was informed that the tire and auto parts store was a retail store and did not perform maintenance operations or tire retreading operations. Based on the lack of maintenance operations and lack of regulatory listings, PM has not identified the previous tire and auto parts store operations as a REC.

The following Business Environmental Risks (BERs) were identified during completion of this Phase I ESA:

* PM observed coal ash around the base of the former coal-fueled boiler in the building basement. Due to the accumulated material, PM was unable to observe the concrete base immediately underneath the coal ash. The observed pavement surrounding the boiler was in good condition.

* Based on the results of a previous survey, asbestos containing materials and lead-based paint are present within the building. It is PM's understanding that the building is planned for renovation.

* Evidence of water intrusion was identified in various areas which could contribute to mold growth as the air is not conditioned.
Commercial (.2)
Hazardous


Top of Page